Flood Control and Drainage21FN0094

REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00 STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00

REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00 STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱75,149,690.44. Status: Reported complete (DPWH). Contractor on record: BICOL GOLDROCK CONST CORP. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱34,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱404,461,000 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FN0094 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-06 → 2021-03-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00  STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱34,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Flood Control Structure along Bicol River Basin, La Purisima Section, Nabua, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱404,461,000.00 · FY2021

Released to Cavite 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

253 projects · ₱14.5B total · 12 flags

Other projects by this contractor

No sat.

CLUSTER I-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-I-A: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-CATANDUANES CIR RD-K0028+000-K0028+647, K0028+788-K0029+000, K

Catanduanes DEO, Region V

2025₱218.7M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BICOL RIVER FLOOD MITIGATION STR

Region V, Region V

2024₱148.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, PACKAGE 3, CAMARINES SUR(2N

Region V, Region V

2022₱144.8M
Reported complete (DPWH)
No sat.

CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE C

Camarines Sur 2nd DEO, Region V

2025₱143.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD, TAGBAC, RAGAY, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱139.6M
Past target date (DPWH On-Going)

OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LIBMANAN RIVER (RIGHT SIDE) WITHIN BICOL RIVER BASIN, BARANGAY MA

Camarines Sur 2nd DEO, Region V

2024₱135.1M
Reported complete (DPWH)
View all 253 projects →

4. Implementation

Contract Amount

₱75,149,690.44

Progress

Reported complete (DPWH)

Start Date

July 7, 2021

Target End

March 14, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00 STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/04233f5f-a279-423f-8133-f4b1adfddc26

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurNabuaSanta Cruz
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.