REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00 STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00
REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER SANTIAGO OLD NABUA SECTION, NABUA, CAMARINES SUR (SECTION 1: STA. 29+350.00 STA. 29+427.00 (LEFTSIDE), STA. 29+450.00 STA. 29+935.50 (LEFTSIDE), SECTION 2: STA. 29+427.00 STA. 29+437.00 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱75,149,690.44. Status: Reported complete (DPWH). Contractor on record: BICOL GOLDROCK CONST CORP. Figures trace to dpwh.
Total Contract Cost


