FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/ FACILITIES, CONSTRUCTION OF RIPRAP, RIGHT SIDE:STA. 23+220 TO STA. 23+393.39, BRGY. SALVACION (FARM), ALANGALANG, LEYTE
FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION OF RIPRAP, RIGHT SIDE:STA. 23+220 TO STA. 23+393.39, BRGY. SALVACION (FARM), ALANGALANG, LEYTE is a DPWH-tracked public work in Leyte 1st DEO, Region VIII. Reported contract value: ₱13,751,420.12. Status: Reported complete (DPWH). Contractor on record: JMAT CONST. Figures trace to dpwh.
Total Contract Cost
