CONTRACT PACKAGE 23: DRERF-FLOOD CONTROL AND DRAINAGE-DRAINAGE/ PROTECTION WORKS: REST. OF COLLAPSED SLOPE PROTECTION, DAMAGED BY TY OMPONG A) RESTORATION OF COLLAPSED SLOPE PROTECTION ALONG MARCOS HI-WAY ROAD, KO282+445-KO282+465 B) RESTORATION OF COLLA
CONTRACT PACKAGE 23: DRERF-FLOOD CONTROL AND DRAINAGE-DRAINAGE/PROTECTION WORKS: REST. OF COLLAPSED SLOPE PROTECTION, DAMAGED BY TY OMPONG A) RESTORATION OF COLLAPSED SLOPE PROTECTION ALONG MARCOS HI-WAY ROAD, KO282+445-KO282+465 B) RESTORATION OF COLLA is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱6,221,888.61. Status: Reported complete (DPWH). Contractor on record: ROYALINK BUILDERS INC. Figures trace to dpwh.