REHABILITATION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.41261°, 11.5599° TO 124.41372°, 11.55871°) 0+454 TO 0+684 (LEFT SIDE)
REHABILITATION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.41261°, 11.5599° TO 124.41372°, 11.55871°) 0+454 TO 0+684 (LEFT SIDE) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱23,954,975.02. Status: Reported complete (DPWH). Contractor on record: YOYEN ENT. Figures trace to dpwh.
Total Contract Cost
