Flood Control and Drainage21PD0055

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION (CONTINUATION) OF THE FLOOD CONTROL ALONG BUED RIVER (CONCRETE WALL NEAR AGAPE FAMILY CHRISTIAN CHURCH) AT CAMP 7 BARANGAY, CAMP 7 BARANGAY, BAGUIO CITY

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION (CONTINUATION) OF THE FLOOD CONTROL ALONG BUED RIVER (CONCRETE WALL NEAR AGAPE FAMILY CHRISTIAN CHURCH) AT CAMP 7 BARANGAY, CAMP 7 BARANGAY, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱1,539,760.38. Status: Reported complete (DPWH). Contractor on record: H D DE CASTRO CONST. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱2,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱392,621,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,539,760 · H.D. DE CASTRO CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-09 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Benguet

Based on the coordinates published with the DPWH record and NOAH file Benguet.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION (CONTINUATION) OF THE FLOOD CONTROL ALONG BUED RIVER (CONCRETE WALL NEAR AGAPE FAMILY CHRISTIAN CHURCH) AT CAMP 7 BARANGAY, CAMP 7 BARANGAY, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction (Continuation) of the Flood Control along Bued River (concrete wall near AGAPE Family Christian Church) at Camp 7 Barangay, Camp 7 Barangay, Baguio City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱392,621,000.00 · FY2021

Released to Batangas 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱1,539,760.38 · H.D. DE CASTRO CONSTRUCTION

Award / contract ref: 21PD0055

Contractor

B

16 projects · ₱35.3M total · 0 flags

4. Implementation

Contract Amount

₱1,539,760.38

Progress

Reported complete (DPWH)

Start Date

May 9, 2021

Target End

September 29, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioCamp 7
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.