Flood Control and Drainage21F00048

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER III-I-REHABILITATION/IMPROVEMENT OF REVETMENT ALONG BARANGAY SAN PEDRO-MONBON SECTION, LEF

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER III-I-REHABILITATION/IMPROVEMENT OF REVETMENT ALONG BARANGAY SAN PEDRO-MONBON SECTION, LEF is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱135,100,000.00. Status: Reported complete (DPWH). Contractor on record: LEGAZPI PREMIUM DEVELOPMENT CORP. Figures trace to dpwh.

Region V, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21F00048 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-02-28 → 2022-06-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Sorsogon

Based on the coordinates published with the DPWH record and NOAH file Sorsogon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER III-I-REHABILITATION/IMPROVEMENT OF REVETMENT ALONG BARANGAY SAN PEDRO-MONBON SECTION, LEF

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2021 GAA. DBM GAA FY2021

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

83 projects · ₱7.0B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS_ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BALOGO SPORTS COMPLEX) SORSOGON OLYMPIC VILLAGE, BALOGO, SORSOGON CITY

Sorsogon DEO, Region V

2022₱293.8M
Reported complete (DPWH)
No sat.

MFO3-MAINTENANCE & CONSTRUCTION SERVICE OF OTHER INFRASTRUCTURE,CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS,TO A.DECLARED TOURISM DESTINATIONS, ROAD IMPROVEMENT OF MATNOG-STA. MAGDALENA-BULUSAN

Region V, Region V

2016₱289.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW-SORSOGON CITY COASTAL BY-PASS ROAD INCL. ROW AND BRIDGE, ROAD: STA.0+000-STA.1+796.60 (W/ EXCEPTION);STA.0+007.19-STA.0+225.33(ACCESS ROAD);BRIDGE:STA.0+525.70-STA.0+586.30(BY-PASS BRIDGE 1),STA.1+7

Region V, Region V

2017₱281.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS/DIVERSION ROADS, INCLUDING ROW SORSOGON CITY COASTAL BYPASS ROAD, STA. 0+893.00 - STA. 1+935, SORSOGON 1ST LD

Region V, Region V

2016₱266.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, ROLANDO A. ANDAYA HIGHWAY, K0327+000-K0338+000 INTERMITTENT SECTION (LUPI-SIPOCOT SECTION), CAMARINES SUR

Region V, Region V

2018₱241.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD INCLUDING SLOPE PROTECTION STRUCTURE ALONG J

Sorsogon DEO, Region V

2023₱190.8M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱135,100,000.00

Progress

Reported complete (DPWH)

Start Date

May 21, 2021

Target End

March 5, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonIrosinMonbon
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.