Construction of Flood Mitigation Structure23FF0016

Construction of Flood Mitigation Structure, San Antonio Quipayo, Calabanga, Camarines Sur

Construction of Flood Mitigation Structure, San Antonio Quipayo, Calabanga, Camarines Sur is a DPWH-tracked public work in CALABANGA (CAMARINES SUR), CAMARINES SUR, Region V. Reported contract value: ₱4,900,002.00. Status: Reported complete (DPWH). Contractor on record: MEGA-ANT BUILDERS AND CONST SUPPLIES. Figures trace to sumbong.

CALABANGA (CAMARINES SUR), CAMARINES SUR, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱5,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-23-0025174 · ₱1,495,049 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FF0016 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-11 → 2025-03-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Mitigation Structure, San Antonio Quipayo, Calabanga, Camarines Sur

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, San Antonio Quipayo, Calabanga, Camarines Sur
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-23-0025174

₱1,495,049.00 · FY2023

Released to 0000000 University of - Southeastern Philippines (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

28 projects · ₱272.9M total · 0 flags

Other projects by this contractor

No sat.

001;ASSET PRESERVATION PROG.-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MANGUIRING-TOMAGODTOD-SIBOBO ROAD-K0458+000-KO458+126.8,KO458+256.5-KO459+430 ,KO463+187-KO464+267 CALABANGA CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2024₱88.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CLUSTER 1:CONST.OF SCHOOL BLDG.(UNDER CY 2024 BEFF-CONST.OF CL(1) DUGCAL ELEM. SCHOOL BRGY. DUGCAL CAMALIGAN CS2)ILIAN ELEM. SCHL. BRGY. TOMAGODTOD CALABANGA CS 3)PILI C/S BRGY. OLD SAN ROQUE PILI CS 4)SAN FRANCISCO ELEM. SCHL.BRGY SAN FRANCISCO CANAMANCS

Camarines Sur 3rd DEO, Region V

2024₱19.8M
Reported complete (DPWH)
No sat.

CSSP;CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO RAILWAYS STATION(KALSADA TUNGO SA PALIPARAN,RILIS AT DAUNGAN PROGRAM-KATUPARAN)-ACCESS ROAD LEADING TO NAGA CITY PNR STATION NAGA CITY CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2024₱19.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION /REHAB. OF WATER SUPPLY SEPTAGE & SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM-CONST. OF SOLAR WATER SYSTEM BRGY. BONOT-STA.ROSA CALABANGA CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2023₱9.7M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure (Spillway), Brgy. Tinangis, Pili, Camarines Sur

PILI (CAPITAL) (CAMARINES SUR), CAMARINES SUR, Region V

2024₱9.7M
Reported complete (DPWH)
No sat.

001;NETWORK DEVELEOPMENT PROGRAM-CONST. OF BY PASS & DIVERSION ROAD - CONST. OF BYPASS AND DIVERSION ROAD AT JUNCTION DAANG MAHARLIKA DEL ROSARIO- CARARAYAN -SAN ISIDRO-NRJ CAROLINA BY PASS ROAD BARANGAY DEL ROSARIO NAGA CITY CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2024₱9.7M
Past target date (DPWH On-Going)
View all 28 projects →

4. Implementation

Contract Amount

₱4,900,002.00

Progress

Reported complete (DPWH)

Start Date

February 17, 2023

Target End

May 2, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCalabangaSan Antonio
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.