Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 3)
Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 3) is a DPWH-tracked public work in AGOO (LA UNION), LA UNION, Region I. Reported contract value: ₱72,334,831.82. Status: Reported complete (DPWH). Contractor on record: ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES. Figures trace to sumbong.
Total Contract Cost



