Flood Control and Drainage25DD0023

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAIYA RIVER, SAN JUAN,

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAIYA RIVER, SAN JUAN, is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱46,803,495.00. Status: Past target date (DPWH On-Going). Contractor on record: HAWK KEY CONST AND GEN MERCHANDISE CORP. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVIII-25-0008413 · ₱220,296 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱46,803,495 · HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    99% reported · imagery 2022-06-03 → 2025-05-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Batangas

Based on the coordinates published with the DPWH record and NOAH file Batangas.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAIYA RIVER, SAN JUAN,

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Calicanto, San Juan, Batangas
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVIII-25-0008413

₱220,296.00 · FY2025

Released to Division of Northern Samar (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25DD0023

₱46,803,495.00 · HAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE .

Contractor

D

11 projects · ₱898.9M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF NATIONAL TOBACCO ADMINISTRATION BUILDING, QUEZON CITY (PHASE 2)

National Capital Region, National Capital Region

2023₱283.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (THE SOCIAL WELFARE AND DEVELOPMENT CENTER FOR ASIA AND THE PACIFIC) WESTERN BICUTAN, TAGUIG CITY

Metro Manila 1st DEO, National Capital Region

2024₱97.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIV

Batangas 4th DEO, Region IV-A

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING A ALONG LAGUNA LAKE HIGHWAY (C-6 ROAD), BRGY LOWER BICUTAN & BRGY. HAGONOY, TAGUIG CITY, PHASE I

Metro Manila 1st DEO, National Capital Region

2023₱96.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG DOÑA ALICIA BRIDGE, TA

Batangas 4th DEO, Region IV-A

2024₱77.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING A ALONG LAGUNA LAKE HIGHWAY (C-6 ROAD), BARANGAY LOWER BICUTAN & BARANGAY HAGONOY, TAGUIG CITY

Metro Manila 1st DEO, National Capital Region

2025₱48.5M
Past target date (DPWH On-Going)
View all 11 projects →

4. Implementation

Contract Amount

₱46,803,495.00

Progress

Past target date (DPWH On-Going)

Start Date

January 17, 2025

Target End

June 29, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasSan JuanLaiya-Aplaya
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.