Flood Control and Drainage21DL0134

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/ RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/ RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES is a DPWH-tracked public work in Quezon 4th DEO, Region IV-A. Reported contract value: ₱19,482,155.49. Status: Reported complete (DPWH). Contractor on record: RAM BUILDERS. Figures trace to dpwh.

Quezon 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱940,886,000 · release to the district office, not itemized per project

    Probable match · score 0.89

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱19,482,155 · RAM BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-18 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/ RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control and Drainage Structures along Pipisik River, Gumaca, Quezon
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱940,886,000.00 · FY2021

Released to Quezon 4th District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21DL0134

₱19,482,155.49 · RAM BUILDERS

Contractor

A

130 projects · ₱2.7B total · 2 flags

Other projects by this contractor

No sat.

A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. TERTIARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0

Quezon 4th DEO, Region IV-A

2019₱94.6M
Reported complete (DPWH)
No sat.

I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 3. QUEZON-ALABAT-PEREZ CIRCUMFERENTIAL ROAD, INCL. ROW, QUEZON

Quezon 4th DEO, Region IV-A

2018₱88.9M
Reported complete (DPWH)
No sat.

A. MFO -1 NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 2. TERTIARY ROADS B. QUEZON-ALABAT-PEREZ RD - K0001+182-K0001+782, K0020+00-K0020+600, K0030+037-K

Quezon 4th DEO, Region IV-A

2017₱83.7M
Reported complete (DPWH)
No sat.

A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM D. REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0153+236 - K0153+25

Quezon 4th DEO, Region IV-A

2020₱78.8M
Reported complete (DPWH)
No sat.

A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS A. ALONG N1 1. DAANG MAHARLIKA (LZ) - K0135+ -732 - K0135+ -332, K0137+000 - K0138+016, K0139+000 - K0139+093, K0139+324 - K0140+2

Quezon 4th DEO, Region IV-A

2017₱76.0M
Reported complete (DPWH)
No sat.

A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES 1. TERTIATY ROADS 1. JCT MSR-OLD ZIGZAG RD - JCT. MSR-OLD ZIGZAG

Quezon 4th DEO, Region IV-A

2018₱70.2M
Reported complete (DPWH)
View all 130 projects →

4. Implementation

Contract Amount

₱19,482,155.49

Progress

Reported complete (DPWH)

Start Date

November 26, 2021

Target End

May 24, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonGumacaProgreso
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.