Flood Control and Drainage20IE0011

CONSTRUCTION OF PALARAO FLOOD CONTROLLEYTE, LEYTE

CONSTRUCTION OF PALARAO FLOOD CONTROLLEYTE, LEYTE is a DPWH-tracked public work in Leyte 3rd DEO, Region VIII. Reported contract value: ₱9,574,988.13. Status: Reported complete (DPWH). Contractor on record: RJ DEEN ENT. Figures trace to dpwh.

Leyte 3rd DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱10,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-20-0009005 · ₱2,866,960 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20IE0011 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PALARAO FLOOD CONTROLLEYTE, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Palarao Flood Control, Leyte, Leyte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-20-0009005

₱2,866,960.00 · FY2020

Released to Leyte 3rd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱9,574,988.13

Progress

Reported complete (DPWH)

Start Date

February 20, 2020

Target End

August 1, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF PALARAO FLOOD CONTROLLEYTE, LEYTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/2427de87-bb15-4ed1-886e-08fff6dbd530

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteLeytePalarao
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.