Flood Control and Drainage24DL0033

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS 1. CONSTRUCTION OF FLOOD CONTROL AND DRAINAG

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS 1. CONSTRUCTION OF FLOOD CONTROL AND DRAINAG is a DPWH-tracked public work in Quezon 4th DEO, Region IV-A. Reported contract value: ₱9,800,000.00. Status: Reported complete (DPWH). Contractor on record: DZEE BUILDERS AND CONST SUPPLY. Figures trace to dpwh.

Quezon 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-24-0008275 · ₱21,044,000 · release to the district office, not itemized per project

    Possible match · score 0.56

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DL0033 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-06-06 → 2015-06-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS 1. CONSTRUCTION OF FLOOD CONTROL AND DRAINAG

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control and Drainage Structure along Calauag River, Calauag, Quezon
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-24-0008275

₱21,044,000.00 · FY2024

Released to Quezon 4th DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

285 projects · ₱2.0B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF BUILDING OF THE SOUTHERN LUZON STATE UNIVERSITY (SLSU) - COLLEGE OF MEDICINE, LUCBAN, QUEZON

Quezon 1st DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

NATIONAL BUILDING PROGRAM, CONSTRUCTION/IMPROVEMENT OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) REGIONAL OFFICE I BUILDING, AGUILA ROAD, SEVILLA, CITY OF SAN FERNANDO, LA UNION

Region I, Region I

2024₱66.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON

Quezon 3rd DEO, Region IV-A

2024₱49.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF CRIME LABORATORY BUILDING, CAMP BGEN OSCAR M. FLORENDO, PARIAN, SAN FERNANDO CIT

La Union 1st DEO, Region I

2022₱38.6M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES 3. CONSTRUCTION OF GUINAYANGAN GOVERNMENT CENTER, GUINAYANGAN, QUEZON, PHASE II

Quezon 4th DEO, Region IV-A

2023₱34.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES 7. CONSTRUCTION OF TWO-STOREY BUILDING (DPWH STANDARD DESIGN) OF QUEZON 4TH DEO, GUMACA, QUEZON

Quezon 4th DEO, Region IV-A

2021₱34.3M
Reported complete (DPWH)
View all 285 projects →

4. Implementation

Contract Amount

₱9,800,000.00

Progress

Reported complete (DPWH)

Start Date

March 13, 2024

Target End

September 8, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonCalauagSumilang
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.