Flood Control and Drainage21FN0073

CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER UPSTREAM OF STA. ELENA NABUA-SAGRADA BAAO SPILLWAY, IRIGA CITY, CAMARINES SUR (STA. 17+404.00 - 17+526.00)

CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER UPSTREAM OF STA. ELENA NABUA-SAGRADA BAAO SPILLWAY, IRIGA CITY, CAMARINES SUR (STA. 17+404.00 - 17+526.00) is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱15,805,807.27. Status: Reported complete (DPWH). Contractor on record: HRB CONST. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱17,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FN0073 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-06-02 → 2021-03-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱129,556 per linear m= 1.0x the Region V median (n=61)

Contract cost ₱15,805,807 ÷ 122 linear m read from the DPWH title (“STA. 17+404.00 - 17+526.00”; station range length (Sta. a+b to c+d)). National percentile: 55. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER UPSTREAM OF STA. ELENA NABUA-SAGRADA BAAO SPILLWAY, IRIGA CITY, CAMARINES SUR (STA. 17+404.00 - 17+526.00)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱17,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/ Rehabilitation of Flood Control Structure along Waras River Upstream of Sta. Elena Nabua-Sagrada Baao Spillway, Iriga City, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Camarines Sur 5th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱15,805,807.27

Progress

Reported complete (DPWH)

Start Date

March 28, 2021

Target End

August 16, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCity of Iriga
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.