Construction of Amambahag Flood Control along Biliran Circumferential Road, Culaba, Biliran
Construction of Amambahag Flood Control along Biliran Circumferential Road, Culaba, Biliran is a DPWH-tracked public work in CULABA (BILIRAN), BILIRAN, Region VIII. Reported contract value: ₱24,476,943.86. Status: Reported complete (DPWH). Contractor on record: YOYEN ENT. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
