Construction of Flood Mitigation Structure23CL0024

Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales

Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales is a DPWH-tracked public work in BOTOLAN (ZAMBALES), ZAMBALES, Region III. Reported contract value: ₱48,998,700.23. Status: Reported complete (DPWH). Contractor on record: R A PAHATI CONST & SUPPLY INC. Figures trace to sumbong.

BOTOLAN (ZAMBALES), ZAMBALES, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CL0024 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-02-18 → 2025-03-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Zambales 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

89 projects · ₱7.3B total · 11 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, ELISEO TRINIDAD ANGELES BRIDGE CROSSING PAMPANGA RIVER, SA

Nueva Ecija 2nd DEO, Region III

2024₱235.2M
Past target date (DPWH On-Going)
No sat.

ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF FLYOVERS / INTERCHANGES / UNDERPASSES / LONG SPAN BRIDGES MOLINO-DAANG HARI FLYOVER, INCL. ROW (PHASE II), CAVITE

Region IV-A, Region IV-A

2018₱230.0M
Reported complete (DPWH)
No sat.

MFO-1 NAT'L. ROAD NETWORK SERVICES, NETWORK DEV'T., CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES, FLYOVER AT MOLINO-DAANG HARI ROAD INTERSECTION, CAVITE 2ND L.D. CAVITE PROVINCE

Region IV-A, Region IV-A

2016₱204.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S

Nueva Ecija 2nd DEO, Region III

2024₱190.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES INCLUDING ROW, TO MORE THAN 2-LANES, DONA JOSEFA BRIDGE (BO1310LZ) ALONG DAANG MAHARLIKA (LZ), NUEVA ECIJA 4TH LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA

Region III, Region III

2017₱187.2M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF THE ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2021₱183.3M
Reported complete (DPWH)
View all 89 projects →

4. Implementation

Contract Amount

₱48,998,700.23

Progress

Reported complete (DPWH)

Start Date

February 22, 2023

Target End

December 18, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesBotolanCarael
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.