Flood Control and Drainage20FL0019

CONST. OF FLOOD CONTROL STRUCTURE ALONG MALUNOY RIVER (UPSTREAM, LEFT SIDE) STA.0+333-STA.0+609& (UP

CONST. OF FLOOD CONTROL STRUCTURE ALONG MALUNOY RIVER (UPSTREAM, LEFT SIDE) STA.0+333-STA.0+609& (UP is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱40,612,180.00. Status: Reported complete (DPWH). Contractor on record: MUNTOPAR BUILDERS CORP. Figures trace to dpwh.

Sorsogon 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱41,906

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FL0019 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-05-02 → 2022-10-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱147,146 per linear m= 1.1x the Region V median (n=61)

Contract cost ₱40,612,180 ÷ 276 linear m read from the DPWH title (“STA.0+333-STA.0+609”; station range length (Sta. a+b to c+d)). National percentile: 61. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Sorsogon

Based on the coordinates published with the DPWH record and NOAH file Sorsogon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF FLOOD CONTROL STRUCTURE ALONG MALUNOY RIVER (UPSTREAM, LEFT SIDE) STA.0+333-STA.0+609& (UP

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱41,906,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Malunoy River (Upstream, Left Side), Sta. 0+000 - Sta. 0+333, Patag, Irosin, Sorsogon
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Sorsogon 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

172 projects · ₱9.6B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE(MVUC) AS PER R.A. 11239-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0275+000-K0276+024, K0276+510-K0277+000, K0283+000-K02

Region V, Region V

2024₱161.4M
Past target date (DPWH On-Going)
No sat.

CLUSTER X-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-X-I: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0601+240-K0602+000, K0605+414-K0606+42

Region V, Region V

2024₱153.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SORSOGON 2ND DISTRICT HOSPITAL, PHASE 3, IROSIN, SORSOGON, BRGY. BUENAVISTA, IROSIN,

Sorsogon 2nd DEO, Region V

2024₱143.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY BALETE TO SIT

Sorsogon DEO, Region V

2025₱143.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD, BARANGAY SAN ANTONIO TO BARANGAY SAN RAFAEL, PRIETO DIAZ, SORSOGON PHASE 2, PR

Sorsogon 2nd DEO, Region V

2025₱142.6M
Past target date (DPWH On-Going)
No sat.

CONST OF MP BUILDING (COVERED COURT) AT BRGY. ROXAS, PADRE DIAZ, BRGY. PALALE, BULAN, BRGY. PAYAWIN,

Sorsogon 2nd DEO, Region V

2025₱142.1M
Past target date (DPWH On-Going)
View all 172 projects →

4. Implementation

Contract Amount

₱40,612,180.00

Progress

Reported complete (DPWH)

Start Date

February 17, 2020

Target End

July 29, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST. OF FLOOD CONTROL STRUCTURE ALONG MALUNOY RIVER (UPSTREAM, LEFT SIDE) STA.0+333-STA.0+609& (UP.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/40291587-f2c9-43d7-9f5c-4b67e929956d

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonIrosinPatag
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.