Rehabilitation / Major Repair of Flood Control Structure22CL0043

Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales

Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales is a DPWH-tracked public work in BOTOLAN (ZAMBALES), ZAMBALES, Region III. Reported contract value: ₱47,039,334.54. Status: Reported complete (DPWH). Contractor on record: ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS & SUPPLY. Figures trace to sumbong.

BOTOLAN (ZAMBALES), ZAMBALES, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0003012 · ₱392,400,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱47,039,335 · ORANI CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-02-18 → 2025-03-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱104,532 per linear m= 0.5x the Region III median (n=202)

Contract cost ₱47,039,335 ÷ 450 linear m read from the DPWH title (“Sta. 0 + 500 - Sta. 0 + 950”; station range length (Sta. a+b to c+d)). National percentile: 43. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003012

₱392,400,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002822

₱60,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0001624

₱3,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22CL0043 - Flood Control Structure at Bucao River

₱47,039,334.54 · ORANI CONSTRUCTION AND SUPPLY

4. Implementation

Contract Amount

₱47,039,334.54

Progress

Reported complete (DPWH)

Start Date

March 16, 2022

Target End

September 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesBotolanCarael
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.