Flood Control and Drainage21FG0038

CONST/IMPRVT OF FLOOD CONTROL STRUCTURE ALONG BALANGAO RIVERSECT. 1 UPSTREAMSTA.0+050.00 - STA.0+532.00 (L/S)STA.0+050.00 - STA.0+532.00 (R/S)SECT. 2 DOWNSTREAMSTA.0+436.00 - STA.0+616.00 (L/S)STA.0+416.00 - STA.0+616.00 (R/S) TIGAON CAM. SUR

CONST/IMPRVT OF FLOOD CONTROL STRUCTURE ALONG BALANGAO RIVERSECT. 1 UPSTREAMSTA.0+050.00 - STA.0+532.00 (L/S)STA.0+050.00 - STA.0+532.00 (R/S)SECT. 2 DOWNSTREAMSTA.0+436.00 - STA.0+616.00 (L/S)STA.0+416.00 - STA.0+616.00 (R/S) TIGAON CAM. SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱91,191,999.99. Status: Reported complete (DPWH). Contractor on record: PARTIDO CONST. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱11,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FG0038 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-04-09 → 2022-11-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱67,851 per linear m= 0.5x the Region V median (n=61)

Contract cost ₱91,192,000 ÷ 1,344 linear m read from the DPWH title (“STA.0+050.00 - STA.0+532.00; STA.0+050.00 - STA.0+532.00; STA.0+436.00 - STA.0+616.00; STA.0+416.00 - STA.0+616.00”; station range length (Sta. a+b to c+d)). National percentile: 22. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST/IMPRVT OF FLOOD CONTROL STRUCTURE ALONG BALANGAO RIVERSECT. 1 UPSTREAMSTA.0+050.00 - STA.0+532.00 (L/S)STA.0+050.00 - STA.0+532.00 (R/S)SECT. 2 DOWNSTREAMSTA.0+436.00 - STA.0+616.00 (L/S)STA.0+416.00 - STA.0+616.00 (R/S) TIGAON CAM. SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱11,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Patitinan River (Igot River), Sag±ay, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Camarines Sur 4th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

134 projects · ₱5.3B total · 0 flags

Other projects by this contractor

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI

Region V, Region V

2024₱198.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING PRIMARY ROADS, DAANG MAHARLIKA, K0251+800.00-K0251+887.00; K0251+1048-K0252+700.00; K0252+750.00-K0254+040.00, CAMARINES NORTE

Region V, Region V

2019₱115.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,LALUD - GARCHITORENA ROAD STA.5+713.73 - STA.10+809.63 LAGONOY, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱106.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,(P00402351LZ)LAGONOY-CARAMOAN ROAD SECTION 1: STA.4+390.90 - STA.6+327.41 SECTION 2: STA.7+640.90 - STA.8+204.39 LAGONOY SECTION, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱100.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0277+000-K0278+956, K0278+994-K0279+225, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2025₱100.2M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0573+089.00 - K0575+000.00; K0575+233.00 - K0575+522.00; K0575+522.00 - K0575+824.00; K0575+895.00 - K0576+1120.00 CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2024₱96.5M
Reported complete (DPWH)
View all 134 projects →

4. Implementation

Contract Amount

₱91,191,999.99

Progress

Reported complete (DPWH)

Start Date

March 8, 2021

Target End

June 25, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurTigaonMabalodbalod
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.