CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RANGAS RIVER DOWNSTREAM BOTH SIDE, STA. 0+460 - 0+709, JUBA
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RANGAS RIVER DOWNSTREAM BOTH SIDE, STA. 0+460 - 0+709, JUBA is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱46,439,947.00. Status: Reported complete (DPWH). Contractor on record: WELEX CONST INC FORMERLY WELEX C. Figures trace to dpwh.
Total Contract Cost

