Flood Control and Drainage24FB0275

CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE ALONG BARANGAY PADANG (UPSTREAM), LEGAZPI CITY, ALBAY

CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE ALONG BARANGAY PADANG (UPSTREAM), LEGAZPI CITY, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱23,364,052.18. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: INFRA BUILDERS AND SELLERS PHILIPPINES. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24FB0275 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-11 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE ALONG BARANGAY PADANG (UPSTREAM), LEGAZPI CITY, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Barangay Pawa, Legazpi City, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

15 projects · ₱938.1M total · 1 flags

Other projects by this contractor

Construction of River Bank Protection Works (Upstream) of Barangay Padang, Legazpi City

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2022₱96.5M
Reported complete (DPWH)

Construction of River Bank Protection Works and Drainage System along Purok 3 Sitio Laom, Barangay Padang, Legazpi City, Albay

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE AND DRAINAGE STRUCTURE, RIVER TRIBUTARIES, BARANGAY TAYSAN, PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2025₱72.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Past target date (DPWH On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTIONG MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Reported complete (DPWH)
No sat.

Construction of River Bank Protection Works and Drainage System along Barangay Padang (Upstream), Legazpi City, Albay

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2023₱67.5M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱23,364,052.18

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 14, 2025

Target End

July 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LegazpiBgy. 50 - Padang
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.