Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Right Side, Downstream of Hibago Bridge, Brgy. Hibago, Ocampo, Camarines Sur
Construction/ Rehabilitation of Flood Protection Measures along Hibago River Flood Mitigation Structure, Right Side, Downstream of Hibago Bridge, Brgy. Hibago, Ocampo, Camarines Sur is a DPWH-tracked public work in OCAMPO (CAMARINES SUR), CAMARINES SUR, Region V. Reported contract value: ₱57,067,962.00. Status: Reported complete (DPWH). Contractor on record: CENTERWAYS CONST AND DEVELOPMENT INC. Figures trace to sumbong.
Total Contract Cost