Flood Control and Drainage17FK0017

CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF BARAYONG RIVER CONTROL, SORSOGON CITY

CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF BARAYONG RIVER CONTROL, SORSOGON CITY is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱18,965,722.29. Status: Reported complete (DPWH). Contractor on record: RODA CONST. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱45,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0019343 · ₱311,300 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FK0017 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-12-09 → 2025-04-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Sorsogon

Based on the coordinates published with the DPWH record and NOAH file Sorsogon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF BARAYONG RIVER CONTROL, SORSOGON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Osiao Flood Control, Bacon District, Sorsogon City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0019343

₱311,300.00 · FY2017

Released to Inawayan National Per High School as (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

62 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION_IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-MATNOG-BULAN-MAGALLANES WEST COAST HIGHWAY, SORSOGON PACKAGE III, MAGALLANES, SORSOGON

Sorsogon DEO, Region V

2022₱106.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-MULTI-PURPOSES BUILDING_FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (INCLUDING ROADWAYS), SORSOGON CAPITOL COMPOUND, SORSOGON CITY

Sorsogon DEO, Region V

2022₱79.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST./UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEV'T. MANAGEMENT (HDM-4) TERTIARY RECONST. FROM CONCRETE TO CONCRETE-BACON SAWANGA-PTO. DIAZ ROAD

Sorsogon DEO, Region V

2017₱73.0M
Reported complete (DPWH)
No sat.

SIPAG: MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/ MEETINGS INCENTIVES CONFERENCES FOR EDUCATION, SPORTS BUILDING (MICES) AND PRIMARY HEALTH CENTERS AT CAMALIG, ALBAY

Albay 2nd DEO, Region V

2023₱71.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST./REHAB. OF HIMAOYON FLOOD CONTROL UPSTREAM & DOWNSTREAM, CASIGURAN

Sorsogon DEO, Region V

2019₱68.9M
Reported complete (DPWH)
No sat.

CLUSTER XXVIII -CONVENGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP)MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- 1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING, SORSOGON EAST CENTRAL SCHOOL, BRGY.BURABOD, SORSOGO

Sorsogon DEO, Region V

2024₱67.8M
Reported complete (100% progress, DPWH status On-Going)
View all 62 projects →

4. Implementation

Contract Amount

₱18,965,722.29

Progress

Reported complete (DPWH)

Start Date

March 3, 2017

Target End

August 29, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCity of SorsogonBarayong
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.