Construction of Drainage Structure23ED0027

Construction of Abaton Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 141.68, Calapan City, Oriental Mindoro

Construction of Abaton Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 141.68, Calapan City, Oriental Mindoro is a DPWH-tracked public work in CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO), ORIENTAL MINDORO, Region IV-B. Reported contract value: ₱33,770,105.07. Status: Reported complete (DPWH). Contractor on record: MARTINEZ ENT / FRAMECON BUILDERS. Figures trace to sumbong.

CITY OF CALAPAN (CAPITAL) (ORIENTAL MINDORO), ORIENTAL MINDORO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱35,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23ED0027 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-10-11 → 2023-05-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱238,355 per linear m= 2.1x the Region IV-B median (n=83)

Contract cost ₱33,770,105 ÷ 141.68 linear m read from the DPWH title (“Sta. 0 + 000 - Sta. 0 + 141.68”; station range length (Sta. a+b to c+d)). National percentile: 79. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Oriental Mindoro

Based on the coordinates published with the DPWH record and NOAH file OrientalMindoro.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Abaton Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 141.68, Calapan City, Oriental Mindoro

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Abaton Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 160, Calapan City, Oriental Mindoro
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Mindoro Oriental District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱33,770,105.07

Progress

Reported complete (DPWH)

Start Date

March 29, 2023

Target End

September 19, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOriental MindoroCity of CalapanParang
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Prapiroon 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.