CONSTRUCTIONS OF RIVERBANKS AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING GOVERNOR'S DRIVE (GMA SECTION), PHASE 1, GMA, CAVITE
CONSTRUCTIONS OF RIVERBANKS AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING GOVERNOR'S DRIVE (GMA SECTION), PHASE 1, GMA, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱96,499,442.00. Status: Reported complete (DPWH). Contractor on record: SUPREME ABF CONST. Figures trace to dpwh.
Total Contract Cost
