Construction of Flood Mitigation Structure22I00018

Construction (Completion) of Storm Surge protection: Tide Embankment, Subsection 4.1A, Brgy. San Jose, Tacloban City, Leyte

Construction (Completion) of Storm Surge protection: Tide Embankment, Subsection 4.1A, Brgy. San Jose, Tacloban City, Leyte is a DPWH-tracked public work in TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE, Region VIII. Reported contract value: ₱82,017,181.14. Status: Reported complete (DPWH). Contractor on record: AQUALINE CONST CORP FORMERLY: AQUALINE CONST. Figures trace to sumbong.

TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE, Region VIII
Region: Region VIII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱9,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0003147 · ₱197,596,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱77,021,355 · AQUALINE CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-01 → 2024-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction (Completion) of Storm Surge protection: Tide Embankment, Subsection 4.1A, Brgy. San Jose, Tacloban City, Leyte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱9,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (Drainage), from Barangay 87 to Barangay 89 San Jose, Tacloban City, Leyte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003147

₱197,596,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-22-0006382

₱28,409,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-22-0006379

₱25,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 22I00018

₱77,021,355.10 · AQUALINE CONSTRUCTION

Award / contract ref: CID No. 22I00018

Contractor

D

245 projects · ₱18.1B total · 0 flags

4. Implementation

Contract Amount

₱82,017,181.14

Progress

Reported complete (DPWH)

Start Date

March 7, 2022

Target End

June 10, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “Construction (Completion) of Storm Surge protection: Tide Embankment, Subsection 4.1A, Brgy. San Jose, Tacloban City, Leyte.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/58f34967-02be-49dd-994e-f4c2f317e317

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)City of Tacloban
Storms whose wind field reached it
Nokaen 2026Koto 2025Kalmaegi 2025Fengshen 2025Bualoi 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.