Construction of Flood Mitigation Structure23DJ0101

Construction of Morong River Flood Control (Package 12), Sariaya, Quezon

Construction of Morong River Flood Control (Package 12), Sariaya, Quezon is a DPWH-tracked public work in SARIAYA (QUEZON), QUEZON, Region IV-A. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS & CONST SUPPLY. Figures trace to sumbong.

SARIAYA (QUEZON), QUEZON, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱30,000

    Probable match · score 0.95

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23DJ0101 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-10-09 → 2025-04-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Morong River Flood Control (Package 12), Sariaya, Quezon

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bantilan River Flood Control (Package 1), Sariaya, Quezon
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Quezon 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

72 projects · ₱6.2B total · 1 flags

Other projects by this contractor

No sat.

CLUSTER IV-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-IV-I: DAANG MAHARLIKA (LZ) K0500+000-K0500+220, K0500+702-K0501+000, K0501+720-K0502+140, K0506+391.28-K0506+861, K0

Region V, Region V

2024₱408.7M
Past target date (DPWH On-Going)
No sat.

PREVENTIVE MAINTENANCE - PRIMARY ROADS DAANG MAHARLIKA (LZ) - K0096 + 586 - K0098 + 757, K0098 + 794 - K0099 + 082, K0100 + 440 - K0102 + 065, K0102 + 074 - K0102 + 450, K0102 + 475 - K0102 + 679

Region IV-A, Region IV-A

2024₱380.2M
Past target date (DPWH On-Going)
No sat.

LOCALLY FUNDED PROJECTS, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-ROADS AND BRIDGES/WATER MANAGEMENT/WATER SUPPLY CONSTRUCTION OF BREAKWATER, BRGY. PUNTA, UNISAN, QUEZON

Region IV-A, Region IV-A

2017₱289.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TAGKAWAYAN-LABO DIVERSION ROAD, (TAGKAWAYAN SECTION), QUEZON

Region IV-A, Region IV-A

2024₱280.4M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS DAANG MAHARLIKA (LZ)

Region IV-A, Region IV-A

2024₱262.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ALBAY WEST COAST RD-K0511+906-K0512+390, LIBON, ALBAY (3RD LEGISLATIVE DISTR

Region V, Region V

2024₱232.8M
Past target date (DPWH On-Going)
View all 72 projects →

4. Implementation

Contract Amount

₱96,500,000.00

Progress

Reported complete (DPWH)

Start Date

June 2, 2023

Target End

April 28, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonCity of TayabasIsabang
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Ewiniar 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.