CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANOLIN RIVER, DOWNSTREAM OF GOYUDAN BRIDGE, BATO, CAMARINES SURLEFT SIDE (STA. 0+000.00 -STA. 0+292.00 & STA. 0+302.00 STA. 0+321.00)RIGHT SIDE (STA. 0+000.00-STA. 0+279.00 & STA. 0+289.00 - STA.0+309
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANOLIN RIVER, DOWNSTREAM OF GOYUDAN BRIDGE, BATO, CAMARINES SURLEFT SIDE (STA. 0+000.00 -STA. 0+292.00 & STA. 0+302.00 STA. 0+321.00)RIGHT SIDE (STA. 0+000.00-STA. 0+279.00 & STA. 0+289.00 - STA.0+309 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱76,682,424.20. Status: Reported complete (DPWH). Contractor on record: ALNINO CONST. Figures trace to dpwh.
Total Contract Cost