Flood Control and Drainage17NG0005

CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BARANGAY POBLACION 1 AND 2, UP TO BARANGAY BITAUG, BURGOS, SURIGAO DEL NORTE (STA. 0+246-0+465), BURGOS, SURIGAO DEL NORTE

CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BARANGAY POBLACION 1 AND 2, UP TO BARANGAY BITAUG, BURGOS, SURIGAO DEL NORTE (STA. 0+246-0+465), BURGOS, SURIGAO DEL NORTE is a DPWH-tracked public work in Surigao del Norte 1st DEO, Region XIII. Reported contract value: ₱13,890,174.01. Status: Reported complete (DPWH). Contractor on record: ROAD EDGE TRADING & DEVELOPMENT SERVICES. Figures trace to dpwh.

Surigao del Norte 1st DEO, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0020340 · · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17NG0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-07-12 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱63,425 per linear m= 0.6x the Region XIII median (n=38)

Contract cost ₱13,890,174 ÷ 219 linear m read from the DPWH title (“STA. 0+246-0+465”; station range length (Sta. a+b to c+d)). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Surigao del Norte

Based on the coordinates published with the DPWH record and NOAH file SurigaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BARANGAY POBLACION 1 AND 2, UP TO BARANGAY BITAUG, BURGOS, SURIGAO DEL NORTE (STA. 0+246-0+465), BURGOS, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage System, Mayag Flood Control, Surigao del Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0020340

₱-36,567,734.00 · FY2017

Released to Camarines Sur 3rd Is District Engineering Office al (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

83 projects · ₱5.7B total · 15 flags

4. Implementation

Contract Amount

₱13,890,174.01

Progress

Reported complete (DPWH)

Start Date

July 3, 2017

Target End

November 29, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteBurgosPoblacion 1
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Ewiniar 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.