CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF ALONG CASINI RIVER, RIGHT SIDE DOWNSTREAM, IROSIN, SORSOG
CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF ALONG CASINI RIVER, RIGHT SIDE DOWNSTREAM, IROSIN, SORSOG is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱42,310,839.60. Status: Reported complete (DPWH). Contractor on record: WELEX CONST INC FORMERLY WELEX C. Figures trace to dpwh.
Total Contract Cost

