Flood Control and Drainage20FE0059

OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. USON, LIBMANAN, CAMARINES SUR

OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. USON, LIBMANAN, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱44,852,640.00. Status: Reported complete (DPWH). Contractor on record: ALNINO CONST. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FE0059 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-06-23 → 2012-06-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. USON, LIBMANAN, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures/Facilities along Libmanan River at Brgy. Sibujo, Libmanan, Camarines Sur
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Camarines Sur 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

123 projects · ₱5.4B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, CAMARINES SUR (2ND LEGISLA

Region V, Region V

2023₱125.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0399+243-K0400+614.45, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2022₱119.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LA MEDALLA-SALVACION-SAN VICENTE DIVERSION ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2024₱106.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY PASS AND DIVERSION ROADS-CASTILLA BY PASS ROAD PACKAGE 3 CASTILLA, SORSOGON

Sorsogon DEO, Region V

2021₱104.0M
Reported complete (DPWH)
No sat.

CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA. PROGRAM-TRIP

Sorsogon 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF PASACAO-BALATAN COASTAL ROAD, BRGY. PINAMASAGAN, SAN FERNANDO, CAMARINES SUR, SAN FERNANDO,

Region V, Region V

2020₱96.5M
Reported complete (DPWH)
View all 123 projects →

4. Implementation

Contract Amount

₱44,852,640.00

Progress

Reported complete (DPWH)

Start Date

February 24, 2020

Target End

October 25, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. USON, LIBMANAN, CAMARINES SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/6bcd6608-fde6-42ba-95c0-6a6515877d3f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurLibmananUson
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.