Construction of Flood Mitigation Structure25CF0028

Construction of Flood Mitigation Structure along Peñaranda River, Barangay Malapit, San Isidro, Nueva Ecija

Construction of Flood Mitigation Structure along Peñaranda River, Barangay Malapit, San Isidro, Nueva Ecija is a DPWH-tracked public work in SAN ISIDRO (NUEVA ECIJA), NUEVA ECIJA, Region III. Reported contract value: ₱96,017,500.53. Status: Reported complete (DPWH). Contractor on record: F-DEY CONST AND TRADING. Figures trace to sumbong.

SAN ISIDRO (NUEVA ECIJA), NUEVA ECIJA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱35,000

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-25-0007585 · ₱55,413,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25CF0028 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-04-16 → 2026-03-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Nueva Ecija

Based on the coordinates published with the DPWH record and NOAH file NuevaEcija.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Mitigation Structure along Peñaranda River, Barangay Malapit, San Isidro, Nueva Ecija

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Pampanga River, Barangay Calaba, San Isidro, Nueva Ecija
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-25-0007585

₱55,413,000.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-25-0000672

₱3,502,000.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-25-0012285

₱1,196,742.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-25-0008102

₱302,709,000.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-25-0000673

₱352,000.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-25-0019357

₱241,000.00 · FY2025

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-25-0015118

₱506,211.00 · FY2025

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

15 projects · ₱407.1M total · 2 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PEÑARANDA RIVER (RIGHT SIDE), BARANGAY CASTELLANO, SAN LEONARDO, NUEVA

Nueva Ecija 2nd DEO, Region III

2025₱96.0M
Past target date (DPWH On-Going)

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PEÑARANDA RIVER, BARANGAY CALLOS, PEÑARANDA, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱96.0M
Reported complete (DPWH)
No sat.

Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan (Right Bank), Peñaranda, Nueva Ecija

PEÑARANDA (NUEVA ECIJA), NUEVA ECIJA, Region III

2024₱20.2M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND-MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239-REPAIR/REHAB./IMPRT ALONG DAANG MAHARLIKA (LZ)-K0084+380K0084+499, K0084+576-K0084+613, K0087+780-K0088+000, K0088+450-K0088+491, K0088+540-K0088+595, K0088+82

Nueva Ecija 2nd DEO, Region III

2022₱19.6M
Reported complete (DPWH)
No sat.

Rehabilitation of Pampanga River Flood Control, Brgy. Sto. Tomas North, Jaen, Nueva Ecija, Sta. 42 + 300.40 to Sta. 42 + 564.40

JAEN (NUEVA ECIJA), NUEVA ECIJA, Region III

2022₱17.2M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. BAGO FMR, BRGY. BAGO, GEN. TINIO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2023₱11.7M
Past target date (DPWH On-Going)
View all 15 projects →

4. Implementation

Contract Amount

₱96,017,500.53

Progress

Reported complete (DPWH)

Start Date

February 20, 2025

Target End

February 5, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaSan Isidro
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.