Rehabilitation / Major Repair of Flood Control Structure24CF0031

Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan (Right Bank), Peñaranda, Nueva Ecija

Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan (Right Bank), Peñaranda, Nueva Ecija is a DPWH-tracked public work in PEÑARANDA (NUEVA ECIJA), NUEVA ECIJA, Region III. Reported contract value: ₱20,168,228.34. Status: Reported complete (DPWH). Contractor on record: F-DEY CONST AND TRADING. Figures trace to sumbong.

PEÑARANDA (NUEVA ECIJA), NUEVA ECIJA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱21,000

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-24-0002880 · ₱6,100,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CF0031 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-19 → 2024-11-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Nueva Ecija

Based on the coordinates published with the DPWH record and NOAH file NuevaEcija.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan (Right Bank), Peñaranda, Nueva Ecija

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱21,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Peñaranda River Flood Control Structure, Barangay Sinasajan ( Right Bank ) , Peñaranda, Nueva Ecija
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0002880

₱6,100,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007112

₱1,895,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0017683

₱578,300.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007113

₱175,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

15 projects · ₱407.1M total · 2 flags

Other projects by this contractor

View all 15 projects →

4. Implementation

Contract Amount

₱20,168,228.34

Progress

Reported complete (DPWH)

Start Date

February 16, 2024

Target End

September 12, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaPeñarandaCallos
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.