Flood Control and Drainage20IB0015

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BORONGAN - GUIUAN ROAD, K01007+150 - K01008+200, GEN. MACARTHUR, EASTERN SAMAR

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BORONGAN - GUIUAN ROAD, K01007+150 - K01008+200, GEN. MACARTHUR, EASTERN SAMAR is a DPWH-tracked public work in Eastern Samar DEO, Region VIII. Reported contract value: ₱26,783,399.81. Status: Reported complete (DPWH). Contractor on record: 888 ACY ENT. Figures trace to dpwh.

Eastern Samar DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱27,330

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20IB0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-07 → 2018-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱25,508 per linear m= 0.3x the Region VIII median (n=35)

Contract cost ₱26,783,400 ÷ 1,050 linear m read from the DPWH title (“K01007+150 - K01008+200”; station range length (Sta. a+b to c+d)). National percentile: 3. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BORONGAN - GUIUAN ROAD, K01007+150 - K01008+200, GEN. MACARTHUR, EASTERN SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱27,330,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Borongan-Guiuan Road, K1007+150-K1008+200, Gen. MacArthur, Eastern Samar
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Eastern Samar DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

292 projects · ₱9.1B total · 5 flags

4. Implementation

Contract Amount

₱26,783,399.81

Progress

Reported complete (DPWH)

Start Date

February 18, 2020

Target End

February 18, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BORONGAN - GUIUAN ROAD, K01007+150 - K01008+200, GEN. MACARTHUR, EASTERN SAMAR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/8506a5d1-c14e-48bb-8682-c6178621e632

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)Eastern Samar
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.