Flood Control and Drainage23DF0078

REHAB. OF DISASTER RELATED INFRASTRUCTURE & OTHER FACILITIES: REHAB. OF DAMAGED INFRASTRUCTURES WROUGHT BY TYPHOON PAENG, REHAB. OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. ARNALDO VIBORA, GEN. TRIAS CITY, STA.0+000- STA.0+100

REHAB. OF DISASTER RELATED INFRASTRUCTURE & OTHER FACILITIES: REHAB. OF DAMAGED INFRASTRUCTURES WROUGHT BY TYPHOON PAENG, REHAB. OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. ARNALDO VIBORA, GEN. TRIAS CITY, STA.0+000- STA.0+100 is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱18,127,957.19. Status: Past target date (DPWH On-Going). Contractor on record: JAGONBUILD CONST CORP FOR JAGON BUILDERS. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱37,500 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23DF0078 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2021-04-23 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱181,280 per linear m= 1.3x the national median (n=191)

Contract cost ₱18,127,957 ÷ 100 linear m read from the DPWH title (“STA.0+000- STA.0+100”; station range length (Sta. a+b to c+d)). National percentile: 64. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Cavite

Based on the coordinates published with the DPWH record and NOAH file Cavite.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB. OF DISASTER RELATED INFRASTRUCTURE & OTHER FACILITIES: REHAB. OF DAMAGED INFRASTRUCTURES WROUGHT BY TYPHOON PAENG, REHAB. OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. ARNALDO VIBORA, GEN. TRIAS CITY, STA.0+000- STA.0+100

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱37,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Road and Other Improvements in Palico 4, Imus, Cavite
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cavite 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱18,127,957.19

Progress

Past target date (DPWH On-Going)

Start Date

March 15, 2023

Target End

September 10, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of General TriasArnaldo Pob.
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.