Flood Control and Drainage24FA0008

CONSTRUCTION OF ROCK CAUSEWAY, SADAY, BARANGAY ALIMSOG, SANTO DOMINGO, ALBAY

CONSTRUCTION OF ROCK CAUSEWAY, SADAY, BARANGAY ALIMSOG, SANTO DOMINGO, ALBAY is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱69,300,000.00. Status: Reported complete (DPWH). Contractor on record: HI-TONE CONST. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱66,874,565 · HI-TONE CONSTRUCTION & DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-05-27 → 2025-06-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROCK CAUSEWAY, SADAY, BARANGAY ALIMSOG, SANTO DOMINGO, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Facilities along Kabilugan / Velasco / Bato River Basin ( Lake Bicol ) , Barangay Awang, Malinao, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID No. 24FA0008

₱66,874,565.00 · HI-TONE CONSTRUCTION & DEVELOPMENT

Award / contract ref: 24FA0008

Contractor

C

555 projects · ₱31.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD/SEAWALL, BARANGAY POBLACION, RAPU-RAPU, ALBAY (PHASE 3) RAPU-RAPU, A

Region V, Region V

2023₱236.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY

Masbate 2nd DEO, Region V

2024₱198.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, DSWD HAVEN FOR DISTRESSED WOMEN, CHILDREN AND, HOME FOR THE AGED AT BARANG

Region V, Region V

2024₱192.1M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-NATIONAL BUILDING PROGRAM-CONSTRUCTION OF 5-STOREY OPD, AMBULATORY AND SPECIALTY CENTER, BICOL REGIONAL TRAINING AND TEACHING HOSPITAL (BRTTH), DARAGA, ALBAY-PHASE 1,DARAGA, ALBAY 2ND L

Region V, Region V

2022₱187.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VI

Region V, Region V

2024₱187.5M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH REGIONAL OFFICE V BUILDING, RES COMPOUND, LEGAZPI CITY, ALBAY (PHASE 5), RES COMPOUND,LEGAZPI CITY, ALBAY(2ND LEGISLATIVE DISTRICT)

Region V, Region V

2023₱187.4M
Past target date (DPWH On-Going)
View all 555 projects →

4. Implementation

Contract Amount

₱69,300,000.00

Progress

Reported complete (DPWH)

Start Date

May 21, 2024

Target End

December 1, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbaySanto DomingoAlimsog
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.