CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER, DOWNSTREAM OF IMBAN BRIDGE, SAN ANTONIO POBLACION, NABUA, CAMARINES SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER, DOWNSTREAM OF IMBAN BRIDGE, SAN ANTONIO POBLACION, NABUA, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱27,524,818.30. Status: Reported complete (DPWH). Contractor on record: EA-EC CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
