Flood Control and Drainage20FN0006

CONSTRUCTION OF WARAS RIVER COURSE, NABUA, CAMARINES SURSTA. 7+320.00 - STA. 7+561.30

CONSTRUCTION OF WARAS RIVER COURSE, NABUA, CAMARINES SURSTA. 7+320.00 - STA. 7+561.30 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱28,514,895.37. Status: Reported complete (DPWH). Contractor on record: AA PAHATI CONST AND SUPPLY. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FN0006 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-09-27 → 2021-03-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF WARAS RIVER COURSE, NABUA, CAMARINES SURSTA. 7+320.00 - STA. 7+561.30

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Waras River, Diversion Road - San Antonio - Sta. Lucia, Nabua, Camrines Sur
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Camarines Sur 5th DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

48 projects · ₱347.5M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BICOL RIVER, UPSTREAM BACOLOD BRIDGE, RIGHT SIDE, STA. 0+147 - STA. 0+600, BATO, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2022₱49.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARIT RIVER SAN ESTEBAN, NABUA, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2021₱37.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SULONG RIVER, BUHI, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2020₱19.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION/IMPROVEMENT OF NAGA CITY FLOOD CONTROL, BRGY. PACOL, NAGA CITY

Camarines Sur 3rd DEO, Region V

2018₱14.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF A FLOOD CONTROL AT CAWACAGAN CREEK, BATO, CAMARINES SURSTA. 0+000 - STA. 0+054.00 (UPSTREAM)STA. 0+000 - STA. 0+030.00 (DOWNSTREAM)

Camarines Sur 5th DEO, Region V

2018₱14.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION/ IMPROVEMENT OF BICOL RIVER FLOOD CONTROL (TABUCO SECTION)NAGA CITY CAM. SUR

Camarines Sur 3rd DEO, Region V

2018₱13.9M
Reported complete (DPWH)
View all 48 projects →

4. Implementation

Contract Amount

₱28,514,895.37

Progress

Reported complete (DPWH)

Start Date

February 20, 2020

Target End

September 28, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurBaaoSagrada
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.