Construction of Flood Mitigation Structure20EB0054

Construction of Flood Control Structures Lumintao River Magsikap Section, Rizal, Occidental Mindoro

Construction of Flood Control Structures Lumintao River Magsikap Section, Rizal, Occidental Mindoro is a DPWH-tracked public work in OCCIDENTAL MINDORO, Region IV-B. Reported contract value: ₱34,690,916.94. Status: Reported complete (DPWH). Contractor on record: HGG BUILDERS & SUPPLY. Figures trace to sumbong.

OCCIDENTAL MINDORO, Region IV-B
Region: Region IV-B

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱35,400

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-20-0014145 · ₱2,235,073

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱34,444,396 · HGG BUILDERS AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-12-20 → 2024-11-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Occidental Mindoro

Based on the coordinates published with the DPWH record and NOAH file OccidentalMindoro.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structures Lumintao River Magsikap Section, Rizal, Occidental Mindoro

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱35,400,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures Lumintao River Magsikap Section, Rizal, Occidental Mindoro
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0014145

₱2,235,073.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0014277

₱2,120,557.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0016276

₱289,144,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0022780

₱269,633.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0001247

₱139,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0001238

₱1,372,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-20-0013006

₱5,548,237.00 · FY2020

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20EB0054-R1 Construction Project

₱34,444,395.79 · HGG BUILDERS AND SUPPLY

Award / contract ref: 20EB0054-R1

Contractor

C

41 projects · ₱5.5B total · 27 flags

4. Implementation

Contract Amount

₱34,690,916.94

Progress

Reported complete (DPWH)

Start Date

February 24, 2020

Target End

February 24, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroRizalMagsikap
Storms whose wind field reached it
Koto 2025Kalmaegi 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.