Flood Control and Drainage20FO0079

REPAIR/REHAB. OF PANGARIAN RIVER FLOOD MITIGATION STRUCTURE WITH ACCESS RD. (BRGY. LA MEDALLA) PIODURAN, ALBAY

REPAIR/REHAB. OF PANGARIAN RIVER FLOOD MITIGATION STRUCTURE WITH ACCESS RD. (BRGY. LA MEDALLA) PIODURAN, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱9,503,991.61. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: NGS CONST SUPPLY. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱10,000

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FO0079 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-29 → 2015-05-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/REHAB. OF PANGARIAN RIVER FLOOD MITIGATION STRUCTURE WITH ACCESS RD. (BRGY. LA MEDALLA) PIODURAN, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Repair/Rehab of Pangarian River Flood Mitigation Structure with Access Rd. (Brgy. La Medalla) Pioduran, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

40 projects · ₱202.4M total · 0 flags

4. Implementation

Contract Amount

₱9,503,991.61

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

October 5, 2020

Target End

February 1, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayPio DuranLa Medalla
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.