CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG BUSALI RIVER PROTECTING BUSALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, PHASE 3 (11.4919, 124.4492), BILIRAN, PROVINCE OF BILIRAN
CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG BUSALI RIVER PROTECTING BUSALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, PHASE 3 (11.4919, 124.4492), BILIRAN, PROVINCE OF BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱18,480,000.00. Status: Reported complete (DPWH). Contractor on record: YOYEN ENT 15541. Figures trace to dpwh.
Total Contract Cost
