Flood Control and Drainage25IA0055

CONSTRUCTION OF CABIBIHAN FLOOD CONTROL ALONG CABIBIHAN - VICTORY ROAD, CAIBIRAN, BILIRAN

CONSTRUCTION OF CABIBIHAN FLOOD CONTROL ALONG CABIBIHAN - VICTORY ROAD, CAIBIRAN, BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱19,568,385.80. Status: Past target date (DPWH On-Going). Contractor on record: RMA BUILDERS. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱20,000

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25IA0055 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    95% reported · imagery 2020-01-21 → 2020-01-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Biliran

Based on the coordinates published with the DPWH record and NOAH file Biliran.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CABIBIHAN FLOOD CONTROL ALONG CABIBIHAN - VICTORY ROAD, CAIBIRAN, BILIRAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabibihan Flood Control along Cabibihan - Victory Road, Caibiran, Biliran
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Biliran DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

F

72 projects · ₱761.0M total · 0 flags

4. Implementation

Contract Amount

₱19,568,385.80

Progress

Past target date (DPWH On-Going)

Start Date

February 26, 2025

Target End

July 18, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF CABIBIHAN FLOOD CONTROL ALONG CABIBIHAN - VICTORY ROAD, CAIBIRAN, BILIRAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/c9e2690f-f127-4b04-b0b6-5be024b1774d

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranCaibiranCabibihan
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.