Flood Control and Drainage23OE0207

INSTALLATION OF BOOSTER PUMP AT SEVERINO DRAINAGE MAIN AT ESTERO DE QUIAPO (PHASE II), MANILA CITY

INSTALLATION OF BOOSTER PUMP AT SEVERINO DRAINAGE MAIN AT ESTERO DE QUIAPO (PHASE II), MANILA CITY is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱72,310,393.29. Status: Reported complete (DPWH). Contractor on record: JELSIE CONST. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱28,750 (shared by many projects, not this project's own line)

    Possible match · score 0.77

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱70,688,053 · JELSIE CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-07-06 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: INSTALLATION OF BOOSTER PUMP AT SEVERINO DRAINAGE MAIN AT ESTERO DE QUIAPO (PHASE II), MANILA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 77%

UACS
18001
Amount
₱28,750,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Las Navas Flood Control Structure and Drainage System, Las Navas River Basin, Las Navas, Northern Samar
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

North Manila DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱70,688,052.55 · JELSIE CONSTRUCTION & SUPPLY

Award / contract ref: 23OE0207

Contractor

D

62 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

RETROFITTING OF MULTI-PURPOSE BUILDING, ISABELO DELOS REYES ELEMENTARY SCHOOL, MANILA CITY

North Manila DEO, National Capital Region

2025₱145.8M
Past target date (DPWH On-Going)
No sat.

RETROFFITING OF SCHOOL BUILDING AT LEGARDA ELEMENTARY SCHOOL, MANILA

North Manila DEO, National Capital Region

2025₱145.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, SENTRO KOMUNIUDAD DE SANTA CRUZ, MANILA (PHASE 1)

North Manila DEO, National Capital Region

2025₱145.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 6

South Manila DEO, National Capital Region

2025₱143.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE, PHASE 5, BASECO COMPOUND, PORT AREA, MANILA

South Manila DEO, National Capital Region

2025₱143.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 7

South Manila DEO, National Capital Region

2025₱142.9M
Past target date (DPWH On-Going)
View all 62 projects →

4. Implementation

Contract Amount

₱72,310,393.29

Progress

Reported complete (DPWH)

Start Date

December 22, 2023

Target End

March 5, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaQuiapoBarangay 391
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.