Flood Control and Drainage25D00288

CONSTRUCTION OF REVETMENT, BARANGAY MAAHAS, LOS BAÑOS, LAGUNA (PHASE 10)

CONSTRUCTION OF REVETMENT, BARANGAY MAAHAS, LOS BAÑOS, LAGUNA (PHASE 10) is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱95,925,078.75. Status: Ongoing (DPWH-reported) (Not Yet Started (DPWH-reported)). Contractor on record: 11 DIAMOND EAGLE CONST CORP FORMERLY:11 DIAMOND EAGLE CONST. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25D00288 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2025-02-01 → 2025-02-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Laguna

Based on the coordinates published with the DPWH record and NOAH file Laguna.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF REVETMENT, BARANGAY MAAHAS, LOS BAÑOS, LAGUNA (PHASE 10)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

4. Implementation

Contract Amount

₱95,925,078.75

Progress

Not Yet Started (DPWH-reported)

Start Date

DPWH didn't publish a start date · Source: DPWH Transparency Portal

Target End

April 19, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaLos Baños
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.