Flood Control and Drainage16FA0005

CONSTRUCTION/REHABILITATION OF BRGY.BALZA RIVER CONTROL (DOWNSTREAM) ALONG QUINALE RIVER, MALINAO, ALBAY

CONSTRUCTION/REHABILITATION OF BRGY.BALZA RIVER CONTROL (DOWNSTREAM) ALONG QUINALE RIVER, MALINAO, ALBAY is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱39,092,980.19. Status: Reported complete (DPWH). Contractor on record: WEARR ENT. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0000776 · ₱28,740 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱39,092,980 · WEARR ENT & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-09-27 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF BRGY.BALZA RIVER CONTROL (DOWNSTREAM) ALONG QUINALE RIVER, MALINAO, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System along Bulang River, 1st District, Brgy. SOA, Malinao, Albay, 1st LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0000776

₱28,740.00 · FY2016

Released to Division of Iriga City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID No. 16FA0005

₱39,092,980.19 · WEARR ENT & DEVELOPMENT CORP

Award / contract ref: 16FA0005

Contractor

C

49 projects · ₱2.5B total · 0 flags

Other projects by this contractor

View all 49 projects →

4. Implementation

Contract Amount

₱39,092,980.19

Progress

Reported complete (DPWH)

Start Date

February 28, 2016

Target End

October 7, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayMalinaoBalza
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.