CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/ IMPT OF RIVERBANK SLOPE PROTECTION, DOWNSTREAM OF CAWACAGAN BRIDGE, CAWACAGAN, BATO, CAMARINES SUR (STA. 0+030.00-STA. 0+262.00 LEFTBANK, STA. 0+040.00-STA 0+253 RB
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPT OF RIVERBANK SLOPE PROTECTION, DOWNSTREAM OF CAWACAGAN BRIDGE, CAWACAGAN, BATO, CAMARINES SUR (STA. 0+030.00-STA. 0+262.00 LEFTBANK, STA. 0+040.00-STA 0+253 RB is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱44,782,088.96. Status: Reported complete (DPWH). Contractor on record: RICHMAR CONST. Figures trace to dpwh.
Total Contract Cost



