Flood Control and Drainage16DK0099

CONST OF MAAPON RIVER FLOOD CONTROL PROJECT BRGY. BARRIO LUAL, MAUBAN, QUEZON STA 0+000-STA 0+492

CONST OF MAAPON RIVER FLOOD CONTROL PROJECT BRGY. BARRIO LUAL, MAUBAN, QUEZON STA 0+000-STA 0+492 is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱9,800,000.00. Status: Reported complete (DPWH). Contractor on record: T A D CONST. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱10,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0021010 · ₱300,000,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16DK0099 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-05-17 → 2017-09-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱19,919 per linear m= 0.1x the Region IV-A median (n=19)

Contract cost ₱9,800,000 ÷ 492 linear m read from the DPWH title (“STA 0+000-STA 0+492”; station range length (Sta. a+b to c+d)). National percentile: 2. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST OF MAAPON RIVER FLOOD CONTROL PROJECT BRGY. BARRIO LUAL, MAUBAN, QUEZON STA 0+000-STA 0+492

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Maapon River Flood Control Project, Brgy. Barrio Lual, Mauban, Quezon
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0021010

₱300,000,000.00 · FY2017

Released to Regional Field Unit - V (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱9,800,000.00

Progress

Reported complete (DPWH)

Start Date

March 15, 2017

Target End

August 7, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonMaubanLual Rural
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Yagi 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.