Typhoon mode · August 30, 2024 – September 9, 2024

Yagi (Enteng) 2024

8,103 DPWH flood-control projects worth ₱396.75B sit within 157.4 km of this storm’s track. Peak sustained wind 145 kt (269 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 157.4 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

8,103

Contract value

₱396.75B

Reported complete

6,683

Ongoing or not reported

1,420

Largest contractors in the path

  1. MG SAMIDAN CONST114 · ₱12.25B
  2. JWU CONST AND SUPPLY113 · ₱10.54B
  3. CENTERWAYS CONST AND DEVELOPMENT INC118 · ₱8.76B
  4. DALCON CONST101 · ₱8.60B
  5. EGB CONST CORP FORMERLY: EGB CONST123 · ₱7.80B
  6. HI-TONE CONST & DEVELOPMENT CORP FORMERLY76 · ₱7.71B
  7. SUNWEST INC FORMERLY: SUNWEST CONST81 · ₱7.34B
  8. HI-TONE CONST99 · ₱7.14B
  9. G C I CONST AND DEV'T CORP73 · ₱7.08B
  10. MAKAPA CORP69 · ₱6.28B

By DPWH implementing office

  1. Region V283 · ₱33.02B
  2. ISABELA321 · ₱21.77B
  3. Albay 2nd DEO383 · ₱20.41B
  4. CAMARINES SUR205 · ₱15.23B
  5. Ilocos Norte 1st DEO610 · ₱14.87B
  6. Abra DEO217 · ₱14.15B
  7. ALBAY214 · ₱12.89B
  8. Isabela 4th DEO183 · ₱12.51B
  9. Flood Control Management Cluster20 · ₱12.43B
  10. Isabela 3rd DEO149 · ₱10.55B
  11. ILOCOS NORTE193 · ₱9.53B
  12. ABRA105 · ₱7.65B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 8,103)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYANFlood Control Management Cluster₱1.10BReported completeRAYMAN BUILDERS INC48Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYANFlood Control Management Cluster₱1.04BReported completeR-II BUILDERS INC47Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYANFlood Control Management Cluster₱945.5MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC34Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱931.7MReported completeRAYMAN BUILDERS INC30Check in
RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱907.5MReported completeRAYMAN BUILDERS INC24Check in
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC3Check in
REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC6Check in
CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRAFlood Control Management Cluster₱853.1MReported completeRAYMAN BUILDERS INC60Check in
DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMARFlood Control Management Cluster₱744.4M87% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY134Check in
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱715.1M94% reported progressMSB VITUG CONST21Check in
REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱669.3MReported completeE M CUERPO INC3Check in
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱533.8M94% reported progressTOKWING CONST CORP FOR TOKWING CONSTRUC9Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCEFlood Control Management Cluster₱445.3MReported completeMSB VITUG CONST134Check in
CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMARFlood Control Management Cluster₱438.8MReported completeMSB VITUG CONST134Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYANFlood Control Management Cluster₱415.9M90% reported progressJ D LEGASPI CONST19Check in
CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control Management Cluster₱366.6MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC54Check in
Construction of Casalogan River Control, Casiguran, AuroraCASIGURAN (AURORA), AURORA₱289.5MReported completeDALCON CONST / EGB CONST CORP FORMERLY: EGB CONST4Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/Region V₱288.5MReported completeSUNWEST INC FORMERLY: SUNWEST CONST98Check in
CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICTRegion V₱281.5MReported completePHILWORKS CONST102Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BRRegion V₱280.3MReported completePHILWORKS CONST100Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeHI-TONE CONST & DEVELOPMENT CORP FORMERLY104Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRICRegion V₱279.8MReported completeG C I CONST AND DEV'T CORP104Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱279.8MReported completeSUNWEST INC FORMERLY: SUNWEST CONST104Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱241.2M90% reported progressSUNWEST INC FORMERLY: SUNWEST CONST95Check in
Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines SurBAAO (CAMARINES SUR), CAMARINES SUR₱241.2MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP95Check in
Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos SurSANTA CATALINA (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST61Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST124Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, CRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT54Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES NRegion V₱240.1M93% reported progressBRENTMIN ROOFING ENT53Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱238.7M90% reported progressE GARCIA CONST CORP FOR E GARCIA CONST54Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGARegion V₱237.4M92% reported progressHGG BUILDERS & SUPPLY48Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGERegion V₱236.4MReported completeE GARCIA CONST CORP FOR E GARCIA CONST56Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN,Region V₱235.9M77% reported progressSUNWEST INC FORMERLY: SUNWEST CONST73Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRICRegion V₱235.7M87% reported progressSUNWEST INC FORMERLY: SUNWEST CONST95Check in
CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCTCatanduanes DEO₱235.3M0% reported progressG C I CONST AND DEV'T CORP23Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAERegion V₱235.2M95% reported progressE GARCIA CONST CORP FOR E GARCIA CONST54Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BARegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST58Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN,Region V₱234.0M80% reported progressHGG BUILDERS & SUPPLY52Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAYRegion V₱234.0M84% reported progressBRENTMIN ROOFING ENT57Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINARegion V₱234.0M96% reported progressHGG BUILDERS & SUPPLY48Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMARRegion V₱234.0M89% reported progressNEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST54Check in
Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos NorteVINTAR (ILOCOS NORTE), ILOCOS NORTE₱211.3MReported completeJOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST19Check in
CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGAFlood Control Management Cluster₱198.7MReported completeA D GONZALES JR CONST16Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B)Region I₱198.0MReported completeALPHA5Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)Region I₱198.0M95% reported progressKATHA BUILDERS & SUPPLIES INC5Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VIRegion V₱198.0MReported completePARTIDO CONST53Check in
CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCECordillera Administrative Region₱193.0M90% reported progressBALINTUGAN CONST72Check in
LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MSR OLD ZIGZAG RD, QUEZONQuezon 4th DEO₱193.0MReported completeKATHA BUILDERS & SUPPLIES INC154Check in
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORARegion III₱193.0MReported completePERSAN CONST INC FORMERLY: PERSAN CONST80Check in
Construction of Abitonan Flood Control Structure, Dipaculao, AuroraDIPACULAO (AURORA), AURORA₱193.0MReported completePERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP79Check in
Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱193.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST4Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, CRegion V₱193.0M96% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY19Check in
Construction of Bulos Flood Control Structure, Dipaculao, AuroraDIPACULAO (AURORA), AURORA₱193.0MReported completeR D TALENS CONST AND TRADING50Check in
Construction of Aguang Flood Control Structure, Baler, AuroraBALER (CAPITAL) (AURORA), AURORA₱193.0MReported completePERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP83Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC,Region V₱193.0MReported completeHI-TONE CONST & DEVELOPMENT CORP FORMERLY30Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION/IMPROVEMENT OF SEAWALL POBLACION-GOGON, RAPU-RAPU, ALBAY (PHASE 2), RAPU-RAPRegion V₱193.0M95% reported progressSUNWEST INC FORMERLY: SUNWEST CONST71Check in
Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, AlbaySANTO DOMINGO (LIBOG) (ALBAY), ALBAY₱193.0MReported completeTR CONST CORP FOR: TR CONST91Check in
Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, AlbaySANTO DOMINGO (LIBOG) (ALBAY), ALBAY₱193.0MReported completeTR CONST CORP FOR: TR CONST91Check in
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package A)INFANTA (QUEZON), QUEZON₱193.0MReported completeSILVERWOLVES CONST CORP133Check in
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package B)INFANTA (QUEZON), QUEZON₱193.0MReported completeSILVERWOLVES CONST CORP133Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I)Region IV-A₱193.0M85% reported progressSILVERWOLVES CONST CORP132Check in
BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LDRegion V₱193.0MReported completeWCS CONST INC102Check in
Construction of Road Dike along Hitoma River, Phase I, Barangay Obi, Caramoran, CatanduanesCARAMORAN (CATANDUANES), CATANDUANES₱193.0MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP19Check in
Construction of Flood Control Structure, Ligao City, Albay Phase IICITY OF LIGAO (ALBAY), ALBAY₱192.9MReported completeSANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL / SISBRO CONST CORP FORMERLY: SISBRO CONST & SUPPLY100Check in
OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOLRegion V₱192.9M96% reported progressMAKAPA CORP105Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMARRegion VIII₱192.9M0% reported progressGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC106Check in
Construction of Flood Control Structure at Binagasbasan, Barangay Paraiso, San Miguel, CatanduanesSAN MIGUEL (CATANDUANES), CATANDUANES₱192.8MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP12Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BARANGAY CALINGATNAN - SITIO MINAELI, BORONGAN CITY, EASTERN SAMARRegion VIII₱192.7M76% reported progressHGG BUILDERS & SUPPLY109Check in
Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, AlbayPOLANGUI (ALBAY), ALBAY₱192.7MReported completeRAMARPLUS INC FORMERLY RAMAR ENT103Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMARRegion VIII₱192.4M85% reported progressAMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP125Check in
Construction of Pantao Storm Surge Protection along Poblacion, Libon, AlbayALBAY₱192.1MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP121Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF PAJO BAGUIO FLOOD CONTROL STRUCTURE,PAJO BAGUIO, VIRAC, CATANDUANES, VIRAC, CRegion V₱192.1M94% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY34Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMARRegion VIII₱191.9M84% reported progressAMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP92Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RORegion II₱191.0M88% reported progressR S K M CONST SERVICES17Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMARRegion VIII₱190.9M67% reported progressELITE GEN CONTRACTOR AND DEVELOPMENT CORP79Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAGRegion II₱190.8M93% reported progressEGB CONST CORP FORMERLY: EGB CONST12Check in
REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT (STA. ELENA-SAN JOSE SECTION) IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICTRegion V₱190.1MReported completeE GARCIA CONST CORP FOR E GARCIA CONST95Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAOCordillera Administrative Region₱190.0M50% reported progressDJY CONST35Check in
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORARegion III₱189.2M78% reported progressPERSAN CONST INC FORMERLY: PERSAN CONST83Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ROAD DIKE, BUDIAO, DARAGA, ALBAY (PACKAGE 2), DARAGA, ALBAY (Region V₱189.2M0% reported progressSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PACRegion V₱189.1M16% reported progressSUNWEST INC FORMERLY: SUNWEST CONST98Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PACRegion V₱189.1M6% reported progressSUNWEST INC FORMERLY: SUNWEST CONST97Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PACRegion V₱189.0M0% reported progressSUNWEST INC FORMERLY: SUNWEST CONST98Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMARRegion VIII₱188.5M90% reported progressELITE GEN CONTRACTOR AND DEVELOPMENT CORP92Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE U, GENERAL NAKAR, QUEZON, PHASE 2Region IV-A₱188.2M70% reported progressSILVERWOLVES CONST CORP134Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE K)Region IV-A₱188.1M95% reported progressSILVERWOLVES CONST CORP132Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE J)Region IV-A₱187.6M0% reported progressSILVERWOLVES CONST CORP132Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BRGY. BASAG, LIGAO CRegion V₱187.6M89% reported progressWCS CONST INC97Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VIRegion V₱187.5M89% reported progressHI-TONE CONST32Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE 1), SITIO LUGI,Region V₱187.2M61% reported progressE GARCIA CONST CORP FOR E GARCIA CONST53Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, OBI, CARAMORAN, CATANDUANES, CARAMRegion V₱187.2M76% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY19Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, SITIO TAGBAK, PARAISO, SAN MIGUEL,Region V₱187.2M98% reported progressHI-TONE CONST13Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN MRegion V₱187.2M78% reported progressHI-TONE CONST20Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DIKE, BARANGAY STO. CRISTO, VIRAC, CATANDUANES,Region V₱187.2M73% reported progressHI-TONE CONST34Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, PACKAGE RRegion IV-A₱187.2M0% reported progressPHESCO INC 145131Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, DOWNSTREAM OF PONSO STEELRegion V₱187.0M97% reported progressPHILWORKS CONST100Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIHA, BORONGAN CITY, EASTERN SAMARRegion VIII₱186.9M69% reported progressGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC114Check in
FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGAFlood Control Management Cluster₱186.4MReported completeA D GONZALES JR CONST16Check in
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (DRegion II₱186.0MReported completeE M CUERPO INC47Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST./IMPV'T. OF CADAC-AN RIVER FLOOD CONTROL SYSTEM,JUBAN, SORSOGONRegion V₱185.2MReported completeMAKAPA CORP111Check in
LEGAZPI CITY URBAN DRAINAGE IMPROVEMENT PROJECT, LEGAZPI CITY COASTAL ROAD WITH JOGGER'S LANE INCLUDING SEAWALL (BAYBAY-SAN ROQUE SECTION) LEGAZPI CITY, ALBAY PROVINCERegion V₱184.8MReported completeSUNWEST INC FORMERLY: SUNWEST CONST99Check in
REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES, BRGY. BUDIAO, DARAGA, ,ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)Region V₱184.5M99% reported progressALRO CONST100Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARARegion II₱183.0MReported completeDOUBLE J1908 CONST25Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CARegion II₱182.6M72% reported progressJOMARCANN GEN CONST12Check in
REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICTRegion V₱181.5MReported completeRAMARPLUS INC FORMERLY RAMAR ENT94Check in
REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICTRegion V₱181.3MReported completeRAMARPLUS INC FORMERLY RAMAR ENT94Check in
REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG YAWA RIVER, BRGY. MALOBAGO, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)Region V₱179.9M93% reported progressJTC CRUZ CONST CO INC101Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMARRegion VIII₱177.9M82% reported progressYPR GEN CONTRACTOR AND CONST SUPPLY INC117Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MITIGATION STRUCTURE ALONG CULASI RIVER, BARANGAY PAMBUHAN, MRegion V₱176.9M98% reported progressBRENTMIN ROOFING ENT58Check in
REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (STA. ELENA-STA. LUCIA SECTION), NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICTRegion V₱176.6M0% reported progressPHILWORKS CONST97Check in
REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT, STA. LUCIA-SAN ANTONIO SECTION, NABUA, CAMARINES SURRegion V₱176.4MReported completeG C I CONST AND DEV'T CORP98Check in
Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 12+260 - Sta. 12+308 Right Side, Sta. 11+792 - Sta. 12+848 Left Side, Juban, SorsogonJUBAN (SORSOGON), SORSOGON₱174.7MReported completeMAKAPA CORP114Check in
Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752.00 - Sta. 24+575.57 Left Side, Sta. 23+806.50 - Sta. 24+357.50 Right Side, Irosin, SorsogonIROSIN (SORSOGON), SORSOGON₱174.4MReported completeMAKAPA CORP120Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STRRegion V₱173.7MReported completeTR CONST CORP FOR: TR CONST91Check in
Construction of Basud River Flood Mitigation structure (Package 1), Barangay Lidong, Sto. Domingo, AlbaySANTO DOMINGO (LIBOG) (ALBAY), ALBAY₱173.7MReported completeTR CONST CORP FOR: TR CONST91Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE(SEAWALL), BARANGAY SABANG, VINZONS, CRegion V₱173.7MReported completeHGG BUILDERS44Check in
REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT)Region V₱173.7M92% reported progressRAMARPLUS INC FORMERLY RAMAR ENT104Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NABONTON RIVER, LIGAO CITY, ALBAYRegion V₱173.6M60% reported progressMAKAPA CORP100Check in
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTERegion I₱173.0MReported completeBADOC BUILDERS10Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON ALRegion V₱171.0MReported completeMAKAPA CORP105Check in
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ABITONAN RIVER FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORARegion III₱169.8MReported completeR D TALENS CONST AND TRADING80Check in
CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD DIKE LEADING ALONG BUHI LAKE BARANGAY IGBAC, BUHI, CAMARINES SURCamarines Sur 5th DEO₱168.9MReported completeSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP87Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMARRegion VIII₱168.8M91% reported progressB VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST126Check in
CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMARRegion VIII₱168.8M45% reported progressB VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST109Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, STA. 4+023.50-STA. 5+547.38(WITH EXRegion V₱168.3M78% reported progressSUNWEST INC FORMERLY: SUNWEST CONST19Check in
REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG TAGAYTAY RIVER, BRGY. TAGAYTAY-BARIW, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT)Region V₱164.9M98% reported progressSTEVEN CONST104Check in
REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES, UPSTREAM OF CAMALIG BRIDGE, BRGY. 4 (POB)-QUIRANGAY, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT)Region V₱164.0MReported completeALRO CONST102Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./IMPV'T. OF PADANG RIVER FLOOD CONTROL SYSTEM,PADANG, LEGAZPI CITY, ALBAY 2ND LDRegion V₱163.2MReported completeMAKAPA CORP94Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONGRegion V₱162.1MReported completeBRENTMIN ROOFING ENT50Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STRRegion V₱161.2M86% reported progressBRENTMIN ROOFING ENT57Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PAJO RIVER FLOOD CONTROL, VIRAC, CATANDUANESRegion V₱159.3MReported completeHI-TONE CONST32Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, LAGORegion V₱159.0M64% reported progressALRO CONST58Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY BATANG, IROSIN, SORSOGONRegion V₱158.3M61% reported progressALRO CONST121Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GABAO RIVER, BARANGAY GABAORegion V₱158.3M85% reported progressALRO CONST121Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2)Region I₱157.3MReported completeA I P CONST90Check in
Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR₱157.3MReported completeA I P CONST89Check in
LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBARegion V₱157.1MReported completeST TIMOTHY CONST CORP94Check in
Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeBALINTUGAN CONST150Check in
Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST148Check in
Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnionBACNOTAN (LA UNION), LA UNION₱154.4MReported completeRODEKOM GEN CONST AND ENT149Check in
Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST146Check in
Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La UnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST149Check in
Construction of Flood Mitigation Structure along Calagdo River, Barangay Tuaca, Basud Camarines NorteBASUD (CAMARINES NORTE), CAMARINES NORTE₱154.4MReported completePARTIDO CONST & SUPPLY65Check in
Construction of Flood Mitigation Structure along Minasag River, Barangay San Lorenzo and Barangay Rizal, Santa Elena, Camarines NorteSANTA ELENA (CAMARINES NORTE), CAMARINES NORTE₱154.4MReported completeHGG BUILDERS & SUPPLY90Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MAMBALITE, DAET, CAMARINRegion V₱149.8M89% reported progressE GARCIA CONST CORP FOR E GARCIA CONST51Check in
CONSTRUCTION/IMPROVEMENT OF PADANG RIVER FLOOD CONTROL SYSTEM (COMPLETION OF GAPS), LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICTRegion V₱149.7MReported completeMAKAPA CORP94Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PAWILI RIVER, BARANGAY FABRICA, BULA, CAMARINESCamarines Sur 5th DEO₱149.6M51% reported progressG C I CONST AND DEV'T CORP95Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY PAWA ANRegion V₱149.6MReported completeSANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL94Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE ALONG BARANGAY MABINIT, LEGAZPI CITY, ARegion V₱149.6M87% reported progressHI-TONE CONST96Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE , PHASE 2, BARANGAY BONGA, LEGAZPI CITYRegion V₱149.6MReported completeHI-TONE CONST96Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SHORE PROTECTION AND SEAWALL ALONG BRGY. CARANAN-BRGY. DALUPARegion V₱149.6M88% reported progressSUNWEST INC FORMERLY: SUNWEST CONST106Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALABAON RIVER FLOOD MITIGATION STRUCTURE, PHASE 1, MANITO, ALBAYAlbay 2nd DEO₱149.6M85% reported progressHI-TONE CONST92Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE ALONG BARANGAY MATANAG, LEGAZPI CITY, ARegion V₱149.6M94% reported progressHI-TONE CONST95Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY BUENAVISTA, IROSIN, SORSRegion V₱149.0M93% reported progressALRO CONST121Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONGRegion V₱149.0M78% reported progressE GARCIA CONST CORP FOR E GARCIA CONST51Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BICOL RIVER FLOOD MITIGATION STRRegion V₱148.6M99% reported progressBICOL GOLDROCK CONST CORP90Check in
CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER, BARANGAY STO. DOMINGO SECTION, NABUA, CAMARINES SURCamarines Sur 5th DEO₱148.5MReported completeG C I CONST AND DEV'T CORP101Check in
CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BICOL RIVER, BARANGAY OMBAO POLPOG SECTION, BULA, CAMARINES SURCamarines Sur 5th DEO₱148.5MReported completeG C I CONST AND DEV'T CORP99Check in
CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRAAbra DEO₱148.5M92% reported progressMG SAMIDAN CONST47Check in
Construction of Salangsang Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱148.5MReported completeMG SAMIDAN CONST44Check in
CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO DALUPIRIP PROPER, DALUPIRIP, ITOGON, BENGUETCordillera Administrative Region₱147.6M89% reported progressMG SAMIDAN CONST144Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUETCordillera Administrative Region₱147.6M65% reported progressUNIVERSAL DE LEON CONST AND AGGREGATES139Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BICORegion V₱147.6M99% reported progressCENTERWAYS CONST AND DEVELOPMENT INC88Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MANTUGAWE, BASUD, CAMARINES NORTE, BARegion V₱147.1M94% reported progressBRENTMIN ROOFING ENT60Check in
Construction of Aguang Flood Control Structure, Baler, Aurora (Phase II)BALER (CAPITAL) (AURORA), AURORA₱146.7MReported completePERSAN CONST INC FORMERLY: PERSAN CONST / 4VC BUILDERS & DEVELOPMENT CORP83Check in
CONSTRUCTION OF SABDANG FLOOD CONTROL ALONG BAUANG RIVER BASIN, POBLACION, SABLAN, BENGUETBenguet 1st DEO₱146.7MReported completeMG SAMIDAN CONST154Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNIONRegion I₱146.3M35% reported progressST MATTHEW GEN CONTRACTOR137Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SHORE PROTECTION AND SEAWALL ALONG BRGY. CARANAN-BRGY. STRegion V₱145.3M98% reported progressSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP106Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M91% reported progressA I P CONST89Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M89% reported progressA I P CONST91Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZRegion V₱144.9M89% reported progressROAD EDGE TRADING52Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG CULASI, BARANGAY PAMRegion V₱144.9M79% reported progressROAD EDGE TRADING58Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST77Check in
Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, KalingaCITY OF TABUK (CAPITAL) (KALINGA), KALINGA₱144.8MReported completeJTM CONST / EGB CONST CORP FORMERLY: EGB CONST10Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, AbraMANABO (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST61Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST80Check in
Construction of Calabuanan-Buhangin Flood Control, Baler, AuroraBALER (CAPITAL) (AURORA), AURORA₱144.8MReported completeDALCON CONST / EGB CONST CORP FORMERLY: EGB CONST85Check in
Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, AlbayCITY OF TABACO (ALBAY), ALBAY₱144.8MReported completeSANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL82Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva ViscayaBAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST102Check in
Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Juban, SorsogonSORSOGON₱144.8MReported completeMAKAPA CORP115Check in
Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Irosin, SorsogonSORSOGON₱144.8MReported completeMAKAPA CORP120Check in
Construction of Flood Mitigation Structure along Kalakran River, Purok 6 to 8, Barangay Saban, Oas, AlbayOAS (ALBAY), ALBAY₱144.8MReported completeRICHMAR CONST107Check in
Construction of Pudok Flood Control (Phase 2), Tayum, AbraTAYUM (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST46Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva ViscayaBAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST102Check in
Construction of Flood Control Structure (Facing Downstream along River Dam Section) Zone 1, Barangay Sta. Cruz, Libon, AlbayLIBON (ALBAY), ALBAY₱144.8MReported completeRAMARPLUS INC FORMERLY RAMAR ENT104Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST80Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva ViscayaSOLANO (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST89Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, AbraLUBA (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST69Check in
Construction/Improvement of Kapantaran River Flood Mitigation Structures (Homapon - Imalnod Section), Legazpi City, AlbayALBAY₱144.8MReported completeMAKAPA CORP107Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, AbraLAGANGILANG (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST44Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, MANAMTAM SECTION 3, BAMBANG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST108Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, STO. DOMINGO SECTION 4, BAMBANG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST107Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, PAITAN SECTION 1, BAYOMBONG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST98Check in
CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGACordillera Administrative Region₱144.8M93% reported progressOMENGAN CONST9Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, POGONSINO SECTION 5, BAGABAG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST82Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDC PACKAGE 1) ALONG MAGAT RIVER, BONFAL PROPER SECTION, BAYOMBONG, NUEVA VIZNueva Vizcaya DEO₱144.8MReported completeDALCON CONST92Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG ANGADANAN RIVER, NALUBBUNAN SECTION 2, QUEZON, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST85Check in
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVER (UPSTREAM - DAHAT SECTION) PACKAGE 1, LAGONOY, CAMARINES SURCamarines Sur 4th DEO₱144.8M92% reported progressHI-TONE CONST & DEVELOPMENT CORP FORMERLY60Check in
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSURCamarines Sur 5th DEO₱144.8M63% reported progressJTC CRUZ CONST CO INC99Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF QUINALE B RIVER FLOOD MITIGATION STRUCTURE, MALINAO,Region V₱144.8MReported completeMAKAPA CORP79Check in
Share card: Yagi (Enteng) 2024: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.