CONSTRUCTION OF FLOOD CONTROL ALONG MAINIT RIVER PROTECTING MAINIT BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2, CAIBIRAN, BILIRAN(124.5466385°, 11.56465814° - 124.5459518°, 11.56326197°)
CONSTRUCTION OF FLOOD CONTROL ALONG MAINIT RIVER PROTECTING MAINIT BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2, CAIBIRAN, BILIRAN(124.5466385°, 11.56465814° - 124.5459518°, 11.56326197°) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱14,200,700.00. Status: Reported complete (DPWH). Contractor on record: YOYEN ENT. Figures trace to dpwh.
Total Contract Cost
