Construction of Flood Mitigation Structure23CJ0008

Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package A), Camiling, Tarlac

Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package A), Camiling, Tarlac is a DPWH-tracked public work in CAMILING (TARLAC), TARLAC, Region III. Reported contract value: ₱48,141,770.99. Status: Reported complete (DPWH). Contractor on record: A C SOLIVEN CONST & GEN MERCHANDISE. Figures trace to sumbong.

CAMILING (TARLAC), TARLAC, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Cubcub, Mayantoc, Tarlac
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Tarlac District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

40 projects · ₱2.1B total · 22 flags

4. Implementation

Contract Amount

₱48,141,770.99

Progress

Reported complete (DPWH)

Start Date

January 30, 2023

Target End

July 29, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.