A C SOLIVEN CONST & GEN MERCHANDISE is listed as a company organization in Philippine public procurement records on this site, with 40 linked DPWH project(s) totaling about ₱2,089,544,591.02. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
A C SOLIVEN CONST & GEN MERCHANDISE
ARegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 40
- Total value
- ₱2,089,544,591.02
- Published flags
- 22
- Region
- TARLAC · Region III
Online presence
Google Maps: A.C. Soliven Construction & General MerchandiseGoogle Maps, 2026-10-22
La Paz, Tarlac, Philippines
Public Record Grade
A transparent, data-derived summary of reported public records for A C SOLIVEN CONST & GEN MERCHANDISE — not an accusation or finding of wrongdoing.
Score: 93.10 / 100 · Projects in sample: 40 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 98.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 98.8
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 39
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 40
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 40
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 40
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 94.8/100 · Weight: 11%
- projects
- 40
- componentScore
- 94.8
- flagsPerProject
- 0.18
- publishedV2Flags
- 7
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 40
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
40 geotagged project(s) — Open full map
- Construction of Camiling-Agno River Floodway Phase 623C00064 · ₱111,012,635.00 · mapped
- Construction of Slope Protection Structure along Camiling River, Poblacion D to G Serction (Package C), Camiling, Tarlac22CJ0194 · ₱97,015,000.00 · mapped
- Rehabilitation of Existing Dike along Rio Chico River, (Balanoy Section, Right Bank), Phase 2, Sta. (-) 5+594.31 to Sta. (-) 6+058.62, La Paz, Tarlac24CK0049 · ₱96,497,852.71 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along O'Donnell-Tarlac River (Right Dike), Armenia-Aguso Section, Tarlac City, Tarlac23CJ0080 · ₱94,811,038.77 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation Along Tarlac River Control Right Dike, Colibangbang Section (Package H), Barangay Colibangbang, Paniqui, Tarlac23CJ0073 · ₱77,199,671.49 · mapped
- Construction of Existing Dike along Lucung River, Cut-Cut II Section, Right Bank, Capas, Tarlac23CK0051 · ₱77,196,575.90 · mapped
- Construction of Flood Control Structure along Meycauayan River, Sta. 01+950 - Sta. 02+100 (Liputan - Ubihan Section), Meycauayan, Bulacan24CD0001 · ₱67,549,934.92 · mapped
- Construction of Flood Control Structure along Meycauayan River, Sta. 01+800 - Sta. 01+950 (Liputan - Ubihan Section), Meycauayan, Bulacan24CD0005 · ₱67,549,893.33 · mapped
- Rehabilitation of Existing Dike along Lucung River (Old Lucung Lilibangan & Magao Section), Concepcion, Tarlac23CK0041 · ₱50,142,663.46 · mapped
- Construction of Slope Protection Structure along Tarlac River (Left Dike), Brillante-Aduas (Package M), Paniqui, Tarlac24CJ0065 · ₱49,500,000.00 · mapped
- Rehabilitation of Existing Dike along Lucung River (Jefmin Section, Left Bank), D/S of Santiago Bridge, Package 2, Concepcion, Tarlac23CK0040 · ₱49,214,625.15 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along O'Donnell River Control Right Dike, Armenia-San Jose De Urquico Section (Package B), Tarlac City, Tarlac23CJ0042 · ₱49,000,000.00 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River Right Bank, Cacamilingan Sur-Cacamilingan Norte Section (Package A), Camiling, Tarlac23CJ0133 · ₱49,000,000.00 · mapped
- Rehabilitation of Existing Dike along Aranguren Creek, Left Bank, U/S of Calumpit Bridge, Capas, Tarlac23CK0038 · ₱48,979,796.38 · mapped
- Construction of Flood Control Structure along Camiling River (Left Bank), Libueg-Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac22CJ0015 · ₱48,388,239.68 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package A), Camiling, Tarlac23CJ0008 · ₱48,141,770.99 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Right Bank, Telbang - Baybayaoas Section (Package B), Camiling, Tarlac23CJ0059 · ₱48,141,152.82 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Brillante-Rang-Ayan Section (Package G), Rang-Ayan, Paniqui, Tarlac23CJ0003 · ₱48,141,038.91 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Left Bank, Anoling 1st to Pao 1st Section (Package B), Camiling, Tarlac23CJ0011 · ₱48,140,980.09 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Delinquente Creek, Bacabac Section (Package 1), Camiling, Tarlac23CJ0014 · ₱48,139,898.83 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation and Road Component Along Camiling River Left Bank, Anoling 3rd to Pao 1st Section, Camiling, Tarlac (Package G)23CJ0141 · ₱48,050,158.90 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation and Road Component along Camiling River Left Bank, Anoling 3rd to Pao 1st Section , Camiling, Tarlac (Package F)23CJ0139 · ₱48,040,048.18 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River, Right Bank, Surgui 1st - Cacamilingan Sur Section (Package A), Camiling, Tarlac23CJ0134 · ₱48,018,969.45 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package C), Gerona, Tarlac23CJ0016 · ₱48,016,060.76 · mapped
- Rehabilitation of Flood Control Structure along Tarlac River Control (Right Dike), Tagumbao-Dicolor Section (Package B), Sta. 0+000 - Sta. 0+313, Gerona, Tarlac22CJ0014 · ₱47,531,186.78 · mapped
- Rehabilitation of Existing Dike along Rio Chico River (Castillo Section, Right Bank), Phase 3, Sta. (-)1+737.60 - Sta. (-)1+926.25 Concepcion, Tarlac24CK0025 · ₱46,750,558.17 · mapped
- Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 1)22AI0137 · ₱45,513,250.28 · mapped
- Construction of Slope Protection along Banila River, Balungao - Rosales, Pangasinan (Package 2)22AI0148 · ₱45,391,096.08 · mapped
- Construction of Flood Control Structure along Rio Chico River (Segment S), Victoria, Tarlac24CJ0018 · ₱45,000,000.00 · mapped
- Construction of Flood Control Structure along Ungot Creek (Segment S), Tarlac City, Tarlac24CJ0051 · ₱45,000,000.00 · mapped
- Construction of Flood Control Structure along Masalasa Creek (Segment L), Tarlac City, Tarlac24CJ0027 · ₱45,000,000.00 · mapped
- Rehabilitation of Existing Dike along Rio Chico River (Rizal-Balanoy Section, Right Bank) Package 1, La Paz, Tarlac23CK0045 · ₱44,466,852.20 · mapped
- Construction of Flood Control Structure along Camiling River (Right Bank), Tambugan-Sawat Section (Package A), Sta. 0+567 - Sta. 0+863, Camiling, Tarlac22CJ0017 · ₱44,217,525.58 · mapped
- Construction of Flood Control Structure along Tarlac River - O'Donnell River Control, Balanti-Armenia Section (Segment N), Tarlac City, Tarlac24CJ0032 · ₱44,099,535.44 · mapped
- Construction of Flood Control Structure along Mitura River, Brgy.Sobol - Brgy. Toboy, Asingan, Pangasinan23AI0082 · ₱39,113,562.58 · mapped
- Construction of Flood Control Structure Along Camiling River Right Bank, Tambugan Section (Phase III), Camiling, Tarlac22CJ0009 · ₱38,708,110.64 · mapped
- Construction of Flood Mitigation Structure along Tarlac River Control, Left Dike, Tibagan-Tibag Section (Package F), Tarlac City22CJ0028 · ₱37,120,120.86 · mapped
- Construction of Flood Control Structure along Totonoguen River, Brgy. Zone 5, Rosales, Pangasinan24AI0035 · ₱22,481,351.38 · mapped
- Construction of Flood Control Structure along Banila River, Brgy. Cabalitian, Umingan, Pangasinan22AI0094 · ₱19,403,532.01 · mapped
- Construction of River Protection along Barangay Dampol II-B, Pulilan, Bulacan22CC0005 · ₱13,859,903.30 · mapped
